|
The Subject Of The Public Procurement Is The Selection Of A Contractor To Carry Out Construction And Repair Works (Srr) In Premises No. 107, 107A, 207, 208, 209, 210, 211, 212, 401, 402 And The Central Entrance Of Usbobal-Varna For The Needs Of The Department Of Ophthalmic Diseases And Vision Sciences On A Total Area Of 210 M2. The Contractor Should Carry Out The Srr, According To The Requirements Of The Employer, Specified In The Technical Specification And General Requirements To The Technical Specification (Appendix No. 1÷No. 1.1). The Types Of Cpps Are As Follows: Dismantling Works - Dismantling Of Compromised Wall Plaster - Earthenware And Wall Coverings On Walls, Dismantling Of Heating Radiators, Removal Of Inventory Equipment, Dismantling Of Existing Flooring - Mosaic And Terracotta, Electric Lighting Fixtures, Switches And Sockets, Sanitary Sinks, Incl. Cast Sink, Incl. Wall Batteries With Isolation Of Water Supply Outlets, Monobloc In Bathrooms, Disassembly Of Doors, Incl. Case And Partition Walls - Pvc And Brick, Dismantling Of Pvc Windows In Rooms 401 And 402. Installation Works - Rooms No. 107, 107A, 207, 208, 209, 210, 211, 212, 401, 402 - Installation Of New Doors, Including One Number - Fireproof For Server Room, Complete Repainting, Forming A New Room With Partition Walls From Itong Blocks With Insulation And Installation Of Air Conditioner For Server Room - Room No. 107, New Lighting In All Rooms, Installation Of Low-Current Installation, Repair And Installation Of Flooring - Granite And Faience On Walls In Sanitary Rooms, Suspended Ceiling Pvc Paneling On Ceilings In Sanitary Rooms And Raster Armstrong Suspended Ceiling In Rooms, Installation Of New Pvc Windows In Rooms 401 And 402, Repair Of Electrical Installation With Installation Of Room Electrical Panels, Plumbing Installations In Sanitary Rooms, Replacement Of Heating Radiators With Replacement Of Vertical Risers Of Hvac And Plumbing Installations. Central Entrance - Installation Of Armstrong Suspended Ceiling And Repainting Of Walls, Counter Closure With Plasterboard Partition. The Contractor Should Carry Out The Srr, According To The Requirements Of The Employer, Specified In The Technical Specification And The General Requirements To It (Appendix No. 1÷No. 1.1).
|