Tenders Are Invited For Parking Lot Construction Work – Execution Works For The Investment Construction Of A ... in Romania
Tender Notice
TenderID
112623648
Tender Brief
Tenders Are Invited For Parking Lot Construction Work – Execution Works For The Investment Construction Of A Parking Lot In The P+2E Regime For The Long Term P5 Parking Lot
Parking Lot Construction Work – Execution Works For The Investment Construction Of A Parking Lot In The P+2E Regime For The Long Term P5 Parking Lot. The Purchase Refers To Execution Works For The Investment Construction Of Parking Lot In P+2E Regime For Long Term P5 Parking Lot. The Execution Of The Contract Includes The Following: The Execution Of The Works For The Purpose Of Which An Above-Ground Multi-Storey Car Park With 795 Spaces Will Be Built, On The Land Located In The Area Of The Henri Coanda International Airport, For The Improvement Of Long-Term Parking Conditions, The Addition Of Parking Spaces And The Decongestion Of Traffic. The Related Functions Of The Parking Are The Technical Ones For Utilities. On The Ground Floor, There Will Be Technical Spaces, A Security Room And A Sanitary Group That Serves This Room. Both The Existing Constructions On Land C1-C7 With A Total Built Area Of 535.00 M² And The Road/Pedestrian Access System To The Tarom Training Center Building Will Be Preserved. The Construction Of The Parking Lot Is Arranged So That The Occupation Of The Land Is As Efficient As Possible And Will Take Place On 4 Usable Levels Ground Floor, 1St Floor, 2Nd Floor And The Circulation Terrace. Parking Will Be Organized As Judiciously As Possible, So As To Obtain The Maximum Number Of Parking Spaces Possible. Access To This Parking Lot Will Be Easily Achieved Through The Network Of Internal Roads Within The Henri Coanda Airport, The Land Being In The Vicinity Of The South Roundabout. Bidders Will Fully Respect The Technical Project Made Available As Part Of The Specifications. Bidders Will Consider, Among Others, The Following: - To Reduce The Execution Time Of The Works, The Contracting Entity May Request That The Execution Of Certain Categories Of Works Take Place Within 24 Hours. The Contractor Must Consider A Work Schedule Including At Night And On Saturdays, Sundays And Public Holidays. - It Is Not Allowed To Attack The Works Without Fencing The Construction Site. The Contractor Is Obliged To Provide Parapets And Signals Around The Routes And Open Excavations, To Build Temporary Bridges, Where The Need Arises. - The Resulting Waste Will Be Collected Under Supervision From The Work Front, Will Be Temporarily Transported To The Collection Points Within The Construction Site. - Lighting Will Be Provided Within The Construction Site. Improvised Wiring Or Improvised Lighting Installations Are Not Allowed. Duration Of The Contract: 62 Months Terms: - Duration Of Execution Of Works - 24 Months From The Date Provided In The Order To Start The Works. - The Duration Of The Reception Procedure At The End Of The Works – 2 Months. - The Duration Related To The Warranty Period For The Remedy Of Defects For Works That Appeared During The Warranty Period - Minimum 36 Months From The Date Of Reception To The Completion Of The Works.
Contact Information
Contact No.
+40 0212042166
Email
monica.udrea@cnab.ro
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112623648
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.