Metalworking – Steel Construction Work. Roof Structure On The Roof Made Of Various Steel Profiles Of Different Dimensions, Exc2, S235, Coating Duplex C3, A Total Of Approx. 86 Tons, - Of Which Approx. 1.2 Tons Are Consoles To Be Delivered And Assembled In Advance, - Including Maintenance Walk With Railings And Giro Covering On Roof Approx. 40 Running Meters, - Including Rope Net Hanging As Ball Catcher V2a, Vertical And Horizontal Approx. 220 M2 - Roof Made Of Pv Glass Elements As A Shed Roof, A Total Of Approx. 400 M2, Including Drainage Channels Made Of Fpo Composite Sheet Truss Attic Made Of Various Steel Profiles Of Different Dimensions, Exc2, S235, Coating Duplex C3, A Total Of Approx. 11.5 Tons, Of Which Approx. 2.2 Tons Delivered And Installed In Advance As Connection Consoles. Insertion Opening With Steel Beams And Two Beam And Giro Levels, Exc2, S235, Hot-Dip Galvanized, Approx. 4.3 Tonnes In Total And Approx. 30 M2 Of Giro Covering Each (60 M2 In Total). Substructure Railing Flat Roof And Stairs For On-Site Railing Construction, Made Of Welded Profiles Made Of S235 Flat Steel, Galvanized, Approx. 67 Tons Plant Troughs Made Of Welded Flat Steel, Stainless Steel 1.4404, Approx. 15 Tons, Including Uk For On-Site Facade Cladding Approx. 190 M2
Contact Information
Address
Friedensstraße 40
Contact No.
000
Email
bekanntmachungen.vz2.bau@muenchen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112623546
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.