|
Engine Oil 15W40 Liter, 93325128 Engine Connecting Rod, Dagua Pump 3802440, Oil Pump Isb 4.5, Bearing Bearing Isb 3.9/4.5/Fpt Nef4 Std, 05/04/2026 - 09:07:50, Bearing Bearing, Engine Connecting Rod Bushing, .4699804 Control Bushing, 70832680 Carter Plug, Isb 4.5 Engine Sleeve, Carter 500323326, 30216 Key, 1363111080 Electrical Harness, Cc452875ba - Air Compressor, 467606730 Cushion, .585248 Engine Shaft Control, Crankshaft Shaft 46778917, Control Gear, Fitting Filter, 7S9396 - Lubricant Filter, Guide 6202539, Injector, Upper Gasket Set Isb 4.5, Clutch Kit 46743925, 50017014 Flexible Hose, Engine Oil Breather Hose, 8200077656 - Valve Spring, 030/105425/N Connecting Rod Screw, Screw, Bh5x/6108/Ba - Piston With Rings, 46789322 Radiator, Retainer, 504101720 Flywheel Retainer, 2R0301807 Bearing, Intake Seat Isb 0, 10, Exhaust Seat Isb 0, Head Seal, Oil Pressure Sensor Isb, D176501a1 High Temperature Silicone, Acetic High Temp Silicone. Black 50 Gr, Belt Tensioner, Tube 6100734, Upper Radiator Tube, 401209 - Return Tube, Water Tube 032/121065/D, Fuel Delivery Tube, Valve Tappet Isb/Qsb/Isf 3.9/4.5/5.9/6.7, 144104495R - Turbine, 94624120 Intake Valve, Relief Valve 6Bt/Isb/6Ct/Fpt Nef6 Bypass, 07W127615 Valve, Exhaust Valve 99432837, Isb Thermostatic Valve, 8200160493- Oil Level Dipstick, Seal Gaskets 73 Gr, F62702 Pump, Injector Nozzle, 5087083 Plate, .75285681 Pump Repair Kit, Valve Repair Kit, Cascade Valve (Thief), Cc45/2875/Ba - Compressor Repair, Motor Gasket, High Pump Overhaul, Injector Nozzle Test, Service To Appoint, Rectify, Diagnose Possible Faults In The Electronic Injection System.(Catser 13463), Jacketing/ Rectifying/ Honing Cylinder Rectification Of The Engine Cylinders. Light, Semi-Heavy, Heavy And Combustion Equipment.(Catser 22853), Planing Block Service Of Planing The Engine Block, This Service Is Carried Out During The Grinding Of The Machines Engine.(Catser 13463), Hydrostatic Testhydrostatic Test In Fire Extinguishers Is A Safety Procedure That Evaluates The Integrity Of The Cylinder Under Pressure, Ensuring That It Can Withstand The Demands Of Use And Prevent Catastrophic Failures. It Is Carried Out With Water Under Pressure, Checking The Existence Of Leaks And The Resistance Of The Material. The Hydrostatic Test Must Be Carried Out Every 5 Years, In Accordance With Abnt Nbr 12962/2016 Standards. The Test Must Be Carried Out By Specialized Companies Certified By Inmetro. Head Planing Head Planing Service Carried Out During Engine Rectification. (Catser 13463), Changing The Valve Seat. Etc...(Catser 13463), Disassembly Of The Enginedisassembly Of The Engine For Rectification.(Catser 13463), Complete Assembly/ Operationcomplete Assembly/ Operation Of The Engine In The Equipment Itself.(
|