|
Provision Of Services - Execution Of Moldings And Plaster Moldings: Production And Installation Of Decorative Plaster Moldings For Ceilings And Walls, According To The Project Or Standard Adopted. Includes Supply Of Materials (Plaster, Glues, Supports, Screws, Etc.), Labor And Equipment Necessary For Application And Finishing. Measurement Per Linear Meter Executed. Labor And Urban Travel Included., Provision Of Services - Supply And Installation Of Conventional Plaster Lining: Application Of Modular Plaster Plates (60 Support Can Be Made With Metal Profiles Or Galvanized Wire No. 14, Fixed With Suitable Anchors And Supports. Includes Complete Supply Of Materials (Plates, Profiles, Screws, Wires, Etc.), Specialized Labor And Tools. Execution According To Nbr 16591 And Nbr 14715-1. Measurement Per Square Meter Executed. Labor And Urban Travel Included, Provision Of Services - Supply And Installation Of Drywall Lining (Plates 120 Joints Treated With Paper Tape And Putty In Three Coats. Finishing With Pva Or Acrylic Spackle, Applying Sealer And Preparing For Painting. Includes All Materials, Skilled Labor, Tools And Epis. Execution In Accordance With Nbr 14715 And Nbr 15217. Labor And Urban Travel Included., Provision Of Services - Supply And Installation Of Drywall Walls/Partitions With A Final Thickness Of 90 To 125 Mm: Assembly With A Metal Structure (Guides And Mounts In Galvanized Steel) Spaced Up To 60 Cm Apart, Using Plasterboards Cardboard 120X180 Cm On Both Sides. Treatment Of Joints With Tape And Putty, Finishing With Pva Or Acrylic Spackle (Two Coats), Specialized Labor And Equipment. Execution According To Nbr15758. Labor And Urban Travel Included., Provision Of Services - Supply And Installation Of Acoustic Insulated Drywall Wall (With Final Thickness Of 90 To 125Mm): Metal Structure (Guides And Mounts Of 48 Mm In Galvanized Steel) Spaced Up To 60 Cm, Filling With Glass Wool Or Pet Wool, Application Of Acoustic Band Between The Profiles And Structure. 120X180 Mm Plasterboards (Acoustic Or Reinforced) Applied On Both Sides. Treatment Of Joints With Tape And Putty, Finishing With Spackle And Sealer. Execution In Accordance With Nbr 15758 And Nbr 10152. Materials, Labor And Urban Travel Included., 04/05/2026 - 16:12:06, Provision Of Services - Repairs And Restoration In Plaster: Correction Of Damaged Areas In Plaster Structures (Cracks, Fissures, Holes, Mold Or Wear). Includes Materials (Putty, Plaster, Tape, Sealer, Etc.), Labor, Equipment And Finishing With Leveling And Preparation For New Painting. Measurement Per Square Meter Repaired. Labor And Urban Commuting Included
|