|
Lot 1 - 01=Preliminary Services 01, 1= Supply And Installation Of Work Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps:, Lot 1 - 03= Paving Pmf 03, 1= Priming With Asphalt Emulsion (Execution, Excludes Supply And Transport Of Bituminous Material To The Work):, 2= Asphalt Emulsion For Priming Service:, 3= Transport With Tank Truck For Transporting Asphalt Material From 30000 L, On Paved Urban Road, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_07/2020 Cm-30 For Printing - Dmt 714Km (Refinery - Betim Mg To The Site Of Obravargem Grande Do Rio Pardo):, 4=Connection Painting (Execution, 05/04/2026 - 16:14:49, 5= Asphalt Emulsions Rl-1C:, 6= Transport By Truck Asphalt Material Transport Tank Of 30000 L, Additional For Dmt Exceeding 30 Km (Unit: Txkm) Cold Premixed (Pmf), In Concrete Mixer, Including Supply And Transport Of Aggregates And Bituminous Material, Including Transport Of Asphalt Mix To The Track:, 7= Transport With 14 M Dump Truck, Additional For Dmt Exceeding 30 Km (Unit: Txkm) - Asphalt Mix Plant To The Construction Site. - Dmt 77, 80 Km:, Lot 1 - 04= Drainage 04, 01= Urban Concrete Gutter (Scu), Type 1, With Fck 15 Mpa, Width Of 50Cm With Slope Of 3%, Esp. Removal Of Excavated Material (In Cacamba):, 02= Installation Of Guide (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length Concrete Walkways E = 6 Cm, Fck = 10 Mpa, Dry Joint:, 2= Tactile Flooring / Podotatil, Hydraulic Tile / Concrete, *25 Pedestrian Or Zebrada Retroreflective Paint Based On Acrylic Resin With Glass Microspheres, E = 30 Cm, Manual Application Self-Propelled. Af_05/2021:, 03= Steel Plate - Film I + Iii - Supply And Implementation (Street Identification):, 04= Modulated Steel Plate N 18 Galvanized With Retroreflective Film Type I + Iii - Manufacturing (Stop Plate):, 05= Galvanized Steel Tube With Seam, Medium Class, Connection Grooved, Dn 65 (2 1/2), Installed In Plumbs - Supply And Installation Af_10/2020:
|