Construction Work For Bridges And Tunnels, Shafts And Subways – Sst04 - Tunnel Og Konstruktioner. The Tunnel Project Is Part Of The Protection Of Copenhagen, Frederiksberg, Gentofte And Gladsaxe Against Flooding In Connection With Cloudburst Events. The Skybrudtunnel Works By Directing Water From The Waste Water System Directly To The Tunnel When The Water Level In The Waste Water System Is High, As A Result Of Rainfall Events In Copenhagen, Gentofte, Gladsaxe And Frederiksberg. In Cases Where The Admitted Water Volume Does Not Exceed The Tunnels Capacity, The Water Will Be Stored In The Tunnel. When There Is Capacity Again In The Waste Water System And At The Treatment Plant, The Stored Water Will Be Pumped Via Discharge Pumps At The Bottom Of The Shaft At Fsk For Treatment At The Treatment Plant Lynette, Through A Newly Established Discharge Line. If The Rainfall Event Exceeds The Tunnels Capacity, The Water Is Directed To Øresund Via The Outlet Construction At Fsk (Fiskerihavnen/Skudehavnen). The Existing Rainwater Network Is Connected To The Cloudburst Tunnel Via Constructions Below Ground, The So-Called Connecting Structures. One Or More Connecting Structures Will Be Established At Most Of The Shafts. At Fiskerihavnen, An Outlet Structure And A Pumping Station Will Be Established, As Well As A Connection To The Existing Waste Water System At The Beach Wing. The Pumping Station Consists Of An Underground Engineering Facility With A Smaller Building Above Ground. The 15 Different Workplaces Are Most Often Referred To In Drawings And Documents With 3-Letter Abbreviations As Shown In Table 1. In The Tender Conditions Section 1.1 Scope Of The Contract. The Connection Workstations Kia And Mga Are Also Mentioned Here. The Tunnel Sections Fsk-Kas And Kas-Ria Are Contiguous And Are Constructed As A Tunnel Section From Fsk To Ria Via Kas. In Addition, Tunneling Is Carried Out At The Fsk Shaft Out To Swan Mill Bay, In Which Parts Of The Discharge Line Are Routed; Work For The Establishment And Connection Of The Drain Line Is Carried Out In A Separate Contract Sst37. Overall, 13 Shafts Must Be Constructed, Which Must Be Connected With Approx. 3.2 Km Segment Tunnel And Approx. 7 Km Pipejacking Tunnel. Connecting Structures Must Be Connected To The Shafts And A Drainage Line Established. Further Information About The Works Can Be Found In The Tender Documents.
Contact Information
Address
Ørestads Boulevard 35
Contact No.
+45 27953810
Email
mbrd@hofor.dk
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112610835
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.