The City Of Karkkila Is Tendering For The Renewal Of The Brick Roof Of Part B Of Nykhkälä School. The Operation Area Is About 900M2, But The Bidder Must Go To The Site Himself To Make Detailed Measurements Before Submitting The Bid. The Offer Must Include The Following Measures And Issues:-Demolition Of The Old Brick Roof-Installation Of A New Roof, Clay Brick Red-The Old Bituminous Felt Underlayment Will Only Be Dismantled In Those Parts Where It Is Damaged. The Old Bituminous Underlayment Contains Asbestos. A Price Per Square Meter Will Be Given For Renewing Any Underlayment (Dismantling And Installation) (Note: Asbestos Removal). The Demolition Includes The Underlayment And The Demolition Of The Beams. New Underlay, E.G. Kerabit 2600 Ub Fleece Or A Similar Product.-Possibly, Removal Of The Cardboard Underlay And Removal Of The Ruts From The Required Area. The Offer Gives The Square Meter Price For Renewal (Dismantling And Installation). New Underlay, E.G. Monier Span Flex, Ormax Or A Similar Product.-The Offer Must Include The Necessary Sheet Metal Work And Possible Sealing Of Penetrations. -Old Footbridges, Snow Barriers And Gutters Will Be Preserved-Necessary Occupational Safety Measures, Including The Installation Of Scaffolding On Both Sides Of The Building. Adequate Protection Must Be Taken Into Account At School Entrances So That Construction Materials Or Tools Cannot Fall From Scaffolding. During School Days, There Are A Lot Of Children And Adults In The Vicinity Of The Construction Site, Which Must Be Taken Into Account When Planning The Safety Of The Work. Fall Protection Must Be Taken Care Of During The Work And The Guard Rail/Net Must Be Installed Before Starting The Demolition Work. The Railings Are Attached To The Frame Of The Building, And Possible Attachment Marks Must Be Patched After The Work Is Finished. -Demolition Waste Waste Fee-Additional Work Hourly Price And For Materials, Yse +12% Is Used For Additional Work.-Necessary Electrical Work Demolition Work May Only Be Done Per Day To The Extent That The Demolished Area Can Be Waterproofed On The Same Day - I.E. The Underlayment Is Installed On The Demolished Area. Weather Protection Must Be Taken Into Account Especially Carefully During The Demolition Work. The Site Should Be Familiarized With Before The Bid Is Placed, So That The Bidder Can Make Detailed Measurements Of The Operation Area, As Well As Define The Required Content Of The Bid. If The Person Submitting The Offer Has Not Seen The Object, The Offer Will Be Rejected. Site Visits Can Be Ordered From Facility Service Manager Harri Lylylahti On 0445535222. The Tenderer Must Be Able To Carry Out The Work During The Year 2025.
Contact Information
Address
Valtatie 26 B
Email
palvelupiste@karkkila.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112545976
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.