At The Dhünn Sewage Treatment Plant, Rainwater Must Be Connected To A Lamella Clarifier For Treatment. For This Purpose, The Existing Pipes Will Be Insulated At The Bottom And A New Dn 250 Rainfall Pipe Will Be Built In The Upper Area And Connected To A Newly Built Lamella Clarifier. A New Shaft Structure Will Be Built. The Existing Lines Should Also Be Closed. In The Event Of An Accident, It Should Be Possible To Close The Drain Line Using A Slide. Excavation Work In Normal Construction Is Necessary. An Angle Retaining Wall Should Be Prepared. A New Lamella Clarifier Will Be Installed. Cable Conduits, A Pressure Pipeline And Rainwater Pipes Must Be Constructed.
Contact Information
Contact Person
ZKV
Address
Untere Lichtenplatzer Str. 100
Contact No.
0202 5830
Email
zkv@wupperverband.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112545285
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.