ventilation Conversion Wing K . Descriptionnordland County Municipality Is To Upgrade The Ventilation System At Bodin High School For Wing K. Companies: K302 Air Treatment Plant, Which Will Be The Main Contractor. Other Contracts: K301 Piping, K401 Electrical Engineering, K203 Construction Work. The School Built In 1984 Is Divided Into Wings, From A To G. Wing K Was Added In 2003. Planned Start In K Is At The End Of School Summer 2026, Approx. Mid-June 26 Orientation Planned Work To Be Carried Out In Summer 2026, Week 24-361 Floor Wing K: Plumbing, New Shower Batteries With Automatic Legionella Flushing On All Showers, New Mains Water Supply Established From Technical Room 2Nd Floor Down To 1St Floor And Canteen Kitchen. Ventilation, Cut-In On Existing Ducts For Installation Of Fire Dampers On 1St Floor. Construction Work, Dismantling Of Existing Ceilings, Reassembly Of Ceilings As Well As Some New Ceilings Including New Shower Systems. · Electrical Work, New Lights With Led And Dali Control Established, Necessary Cabling For Knx - Control Of Fire Dampers/Heat/Lights. Cabling To Sd System. 2Nd Floor Wing K Up To The Fire Wall Towards The Sports Department (Axis 24): (The Remaining Area Will Be Taken At The Beginning Of September If Possible) Plumbing, Some Work In The Kitchen In Relation To The New Water Supply From The 1St Floor. Ventilation, Cutting Into Existing Ventilation Ducts For The Installation Of Fire Dampers And Vav Dampers For Controlling Ventilation. Canteen Area.· Electrical Work, New Lights With Led And Dali Control Established, Necessary Cabling For Knx - Control Of Fire Dampers/Ventilation/Heating/Lighting. Cabling To Sd System. Completion Planned Summer 2027: 3Rd Floor Wing K· Piping Work, New Actuators For Controlling Radiators.· Ventilation, Cutting Into Existing Ventilation Ducts For Installation Of Fire Dampers And Vav Dampers For Control Of Ventilation.· Construction Work, Dismantling Of Existing Ceilings As Well As Reassembly Of Ceiling Dishes, Technical Remodeling Work.· Electrical Engineering Work, New Lights With Led And Dali Control Established, Necessary Cabling For Knx - Control Of Fire Dampers/Ventilation/Heating/Lights. Cabling To Sd Facility. Technical Room 1St Floor Wing K, Option: All 3 Units Are Replaced/Renovated And Delivered With New Automation For Control From Sd Facility. This Work Must Be Postponed Until Next Year 2027 Due To Delivery Times. Todays Aggregates Have A Low Construction Height, The Height Of Standard Aggregates Is 40 Cm Higher Than There Is Room For In The Technical Room. When Changing To New Standard Aggregates, This Will Entail A Major Rebuilding Of Existing Ducts.
Contact Information
Address
Norbygata 14
Contact No.
+4767128000
Email
frode.sorensen@sweco.no
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112543566
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.