|
1. The Subject Of The Order Is The Implementation Of An Investment Consisting In The Construction Of A Sanitary And Cloakroom Building With Accompanying Infrastructure On The Gałowska Sports Field In Wrocław At Ul. Gałowska 12, On Plots No. 10/5 And 9/2, Jerzmanowo District.2. Place Of Performance Of The Subject Of The Order: Sports Field Gałowska, Ul. Gałowska 12, Wrocław.3. The Scope Of The Order Includes In Particular: 1) Preparatory And Demolition Works: A) Securing, Fencing And Marking The Construction Site, B) Geodetic Marking Of Facilities, C) Preparing The Area For The Investment, D) Performing Possible Demolition And Dismantling Works Of Elements Colliding With The Investment, E) Removing Conflicts With The Existing Land Development. 2) Earthworks: A) Excavation For The Sanitary And Cloakroom Building, B) Excavation For Technical Infrastructure, C) Excavation For External Installations (Water Supply, Sewage, Electricity), D) Preparation And Strengthening Of The Subsoil To The Required Load-Bearing Capacity, E) Backfilling, Compaction And Profiling Of The Area, F) Leveling The Area To The Extent Necessary To Implement The Investment. 3) Construction Of A Sanitary And Cloakroom Buildinga) Construction And Construction Worksa. Construction Of Foundations, B. Construction Of The Building, C. Construction Of External And Internal Partitions, D. Construction Of A Gable Roof. B) Joinerya. Installation Of Window Joinery, B. Installation Of Door Joinery.C) Internal Installationsa. Water And Sewage Installations, B. Electrical Installations, C. Central Heating Installations, D. Technological Installations (Heat And Cold), Heat Pump, E. Installation Of A Water Treatment Plant. D) Finishing Worksa. Internal Finishing Works, B. Preparing Rooms For Use. E) External Installationsa. Sanitary Installations• External Water Supply System (Domestic Purposes And Watering),• External Sanitary Sewage System,• External Rainwater System,• Installation Of A Rainwater Retention Tank (Approx. 10 M³),• Construction Of A Buffer Tank And Pumping Station,• Construction Of An Overflow Installation And An Emergency System. B. Irrigation System• Implementation Of The Pitch Irrigation Installation (Pipelines, Sprinklers, Electrovalves),• Power Supply To The System From The Retention Reservoir And Water Supply Network. C. External Electrical Installations• Building Power Supply,• Sports Field Lighting,• Area Lighting (Parking Lots, Accesses),• Installation Of Cable Lines And Necessary Devices. F) Road Works And Land Developmenta. Construction Of A Parking Lot (10 Parking Spaces, Including A Space For Disabled People), B. Construction Of Surfaces From Concrete Cubes And Openwork Slabs, C. Construction Of Sidewalks (Paving Stones And Epdm Surface), D. Making Gravel Strips, E. Hardening The Entrance To The Investment Area, F. Construction Of A Waste Collection Site, G. Installation Of Bicycle Racks, H. Implementation Of A Facility Monitoring System. G) Small Architecture And S
|