Construction Work For Water Projects – Eckernförde Naval Base, Repair Of The Western Pier. The Repair Of The Title Of Engineering Structures Includes The Following Essential Services: 1. Dismantling Of The Old Wave Protection Wall Including Strapping And Equipment 2. Production Of A Steel Structure To Accommodate The New Wave Protection Wall 3. Installation Of A New Wave Protection Wall 4. Outside Of The Pier: Increase In Concrete Cover On The Vertical Outer Walls Of The Pier Using Spray Mortar, Sea-Side Surface Spray-Rough, Port-Side Surface Smoothed. 5. Caps: Repair Of Individual Damaged Areas And Application Of A Surface Protection System Os 11B With A Sealing Effect. 6. Port-Side Cap: Installation Of Edge Protection 7. Caps, Block Joint: Removal Of The Existing Joint Material And Application Of A Liquid Plastic Seal With An Overlying Drag Plate Construction In The Cap Area Of The Block Joints 8. Roadway: Dismantling The Ga Covering, Repairing Individual Damaged Areas, Crack Grouting, Roadway Sealing According To Ztv-Ing, New Construction Of The Roadway, Replacing Existing Inlets, Leveling Of The Manhole Cover In The Roadway 9. Roadway, Block Joint: Dismantling The Existing Transition Structure And Installation Of A Transition Structure Made Of Asphalt According To Ztv-Ing Part 8-2 10. Mole Hollow Girder: Cathodic Corrosion Protection Including Protective Screed On The Inner Walls Up To 0.5 M And On The Bottom Of The Pier Hollow Girders 11. Mole Hollow Girder: Ceiling And Walls Over 0.5 M Local Concrete Repair 12. Mole Hollow Girder, Block Joint: Dismantling The Existing Construction As Well As Installation Of An Adhesive Seal And Covered In Areas By A Drag Sheet Construction At The Block Joints Of The Closed Hollow Boxes. 13. Mole Hollow Girder: Dismantling The Existing Emptying Devices In The Hollow Girder And Closing The Penetrations Using Blind Seals As Well As Installing New Pump Sumps. 14. Underside Of The Pier Superstructure: Repair Of Individual Damaged Areas On The Underside Of The Pier And The Bar Inspection Process, Carried Out By Divers The Repair Of The Tga Title Includes The Following Essential Services: 1. Activation Of The Existing Electrical System 2. Dismantling Of The Technical System 2.1 Separation And Dismantling Of The Sw System Up To The Handover Point 2.2 Separation And Dismantling Of The Tw System With Trace Heating 2.3 Dismantling Of The Existing Electrical System 2.4 Dismantling Of The Existing Media Installation And Kks System 2.5 Separation And Dismantling Of The Existing Refueling System 2.6 Laying Of Temporary Cables For The Pier Fire And Camera System 2.7 Draining Of The Lines 2.8 Dismantling Of The Tw Supply Boxes 2.9 Dismantling Of The Waste Water Delivery Points 2.10 Dismantling Of The Signs, Railings, Lighting Masts On The Pier 3. Ensuring The Supply Of The Property With Water, If This Is Affected By The Dismantling 4. Conversion Of The Camera System And Pier Fire In The Course Of Structural Repairs 5. Installation Of The Ta After Structural Repairs 5.1 Installation And Temporary Power Supply Of The Lighting 5.2 Installation Of The Cable Laying Systems (First) 5.3 Laying The Sewage Pipes In The Direction Of The Me
Contact Information
Contact No.
000
Email
marinebau.lkn@lkn.landsh.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112527594
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.