Sewerage Work – Technical System In Outdoor Facilities. Preliminary Measure: Before Construction Stage 1 Of The New Zop And Energy Building Begins, It Is Necessary To Replace The Existing Supply And Disposal Lines In The Construction Site So That They Are Fully Functional. This Includes The Following Measures/Media: - New Installation Of The Rain And Waste Water Pipes In The Outdoor Area With Rain Retention And Separation System - Dismantling Of The Existing Rain And Waste Water Pipes With The Associated Shafts In The Construction Site - New Installation Of The Fire Extinguishing Line With The Hydrants - Dismantling Of The Existing Fire Extinguishing Lines And Hydrants In The Construction Area - Creation Of A Temporary Connection Line - New Installation Of The Fire Extinguishing Tank With A Nominal Volume Of 200M³ - New Installation Of The Oxygen Tank System (On Site) With A New Connection The Supply Line To The Existing Building - Restoring Surfaces Such As Footpaths, Cycle Paths And Road Areas
Contact Information
Address
Alte Rothenfelder Straße 23
Contact No.
+49 (541) 502-0
Email
verwaltung-fhh@nsk.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112526712
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.