Bids Are invited for Fabrication And Erection Work The Work Of Cutting And Removing The Wornout Pipe Line From Half Inch To 12 Inches Dia And Installing The New Pipe At The Same Place - Fabrication , Fabricating And Replacing Wornout Bands Nipples Crosses Reducer With New One From Half Inch Dia To 12 Inches Dia - Fabrication , Renovation Work Of Half Inch To 12 Inch Diameter Coils - Fabrication , The Work Of Fabricating And Installing New Flanges Of 6 To 12 Inches Diameter - Fabrication , The Work Of Cutting And Removing The 14 Inch To 40 Inch Wornout Pipe Line And Fabricating A New One And Installing It At The Same Place - Fabrication , Cutting And Removing Wornout Bands Nipples Crosses Tees Reducer With New One From 14 Inches To 40 Inches Dia And Fabricating New Ones And Installing Them At The Same Place - Fabrication , The Work Of Making And Installing New Flanges Of 14 Inches To 40 Inches Diameter In Place Of Warn Out Flanges - Fabrication , Fabricate The Round And Square Tank In The Mill And Installed It And Put All The Connections Up To 01 Meter - Fabrication , Fabricate The Round And Square Tank In The Mill And Installed It And Put All The Connections Above 1 Meter Diameter - Fabrication , Strengthening With Heavy Structures At Various Places - Fabrication , Strengthening With Light Structures At Various Places - Fabrication , Strengthening And Repairing Wornout Platform At Various Places - Fabrication , Making And Replacing Manholes At Various Places - Fabrication , Replacing Old And Wornout Cones At Various Places With New One And Making It With 8 Or 10 Mm Ms Plate Installing Up To 01 Meter - Fabrication , Replacing Old And Wornout Cones At Various Places With New One And Making It With 8 Or 10 Mm Ms Plate Installing Above 01 Meter - Fabrication , Making And Replacing Wornout Casing With Newone And Making It With 6 Or 8Mm Ms Plate At Various Places Of Fan - Fabrication , Making And Installing Catchers At Various Stations Including All Connections - Fabrication , Patching Work Of Wornout Equipment At Various Stations - Fabrication , Replacing Wornout Truff Of Cane Carrier Baggase Elivatore And Rbc With New Ms Plate - Fabrication , Replacing Wornout Side Plate With New Ms Plate Of Various Places - Fabrication , Replacing Wornout Runner Base And Installing A New Runner Base Of Cane Carrier And Baggage Elevator And R B C - Fabrication , Replacing Wornout Runner With New One Of Cane Carrier And Baggage Elevator And R B C - Fabrication , Removing Wornout Angle Iron And T Iron Of The Cane Carrier And Reinstalling It By Straightening The Crooked Part - Fabrication , Removing The Wornout Part Of The Suit From Different Places And Fitting It With New One - Fabrication , Chevron Grooving Of New Rollers Of The Mill - Fabrication , Chevron Grooving Of Old Rollers Of The Mill - Fabrication , Remove The Wornout Partition Plates Of The Juice Box Above And Below The Juice Heater By 10 Or 12 Mm Ms Plate And Install It - Fabrication , Installing Ribs At The Top And Bottom Partitions Of The Juice Heater - Fabrication , Repairing Save All Of Qurdbody - Fabrication , Removing Old Wornout Gutters Installed At Various Places And Installing It With New Gutters - Fabrication , Remove The Old Wornout Save All From Pan And Quard And Install It With New One - Fabrication , Reinstalling The New Umbrella Fitted Inside The Pan By Making A New One And Removing The Old One - Fabrication , Replacement Ribbon Arm Of The Mascute Receiving Crystallizer - Fabrication , Making New Separator Of A Centrifugal Machine - Fabrication , Removing The Wornout Truff Of The Hopper And Installing It With New One - Fabrication , Making And Installing New Separators For Continuous Centrifugal Machines - Fabrication , Removing The Tubes Of Quad Juice Heater And Dynamic Juice Heater And Expanding Them By Installing New Tubes And Giving Their Hydraulic Testing Satisfactory Of Size 42 Mm - Fabrication , Removing The Tubes Of Pan Installing New Tubes And Expanding Them And Giving Hydraulic Tesing With Satisfactory Trial Of Size 96 Mm - Fabrication , Removing The Wornout Flue Gas Ducting Of Both The Boilers And Installing It With Newone Making From New Or Old Plates - Fabrication , Removing The Wornout Front And Roof Plate At Boiler Number 1 And 2 And Installing With A New Plate - Fabrication , Removing The Damaged Boiler D Er And Installing A New One - Fabrication , Making Bagasse Suit And Installing. - Fabrication , Replacement Of Juice Over Flow Box Of Clarifier - Fabrication , Making And Installing Bed Of Motor And Pumps At Various Places As Per Requirement - Fabrication , Replacement 6 Inch Dia Cooling Pipe Of Sulfur Furnace - Fabrication , Removing The Monitor Casing Of A Machine From Old Machine And Installing It And Giving Its A Trial - Fabrication , Making Amd Replacing Manholes At Various Places - Fabrication , Making And Replacing The Enternals Of Cather Of The Pan. - Fabrication , Making And Replacing The New Hood Of Cane Cutter - Fabrication , Removing The Old Bottom Plate Of The Lowest Compartment Of The Clarifier And Placing A New Plate On It After Placing An Angle Trap As Per The Instructions And Giving A Satisfactory Water Trial - Fabrication , Reinstalling The Stirrer Of The Clarifier And Giving A Satisfactory Trial - Fabrication , Removing The Shaft Of A Pug Mill And Replacing The Old Bushes On Both Sides And Fitting New Ones - Fabrication , Removing And Refitting The Shaft Of A Brown Sugar Magma Mixer And Installing With New Bush - Fabrication , Reinstalling The Trufff Of Connecting Rod Of The Hopper - Fabrication , Making And Installing New Catcher Strainer - Fabrication , Removing The Old Rail Line Of The Trolley Of The Unloader And Fitting The New Rail Line Satisfactorily And Doing Water Level - Fabrication , Reinstalling The Old Rail Line Of The Unloader S Bridge And Fitting It And Checking Water Level Etc - Fabrication , Removal Of Old And Weak Channels Of 3 Inches To 10 Inches Diameter Installed At Various Places And Installation Of New Ones As Per Requirement - Fabrication , Cutting And Straightening Old Plates Installed At Various Places As Per Requirement - Fabrication , Removal Of Old And Wornout Scrubber Installed On Sulfur Furnace And Making And Replacing With 8 Or 10 Mm Plate And Making All The Connections - Fabrication , Removing The Trufff Plate Including Support Corroded Shell And Top Cover Plate Of The Top Chamber Of The Clarifier And Fitting The New Plate And Giving It S A Water Proof Trial - Fabrication , Re-Installation Alignment And Trial Of Hopper Driving End - Fabrication , Making And Installing The Top Cover Of The Centrifugal Machine - Fabrication , Making An Arm And Installing It On The Shaft Of Pug Mill - Fabrication , Making And Installing Scrubber And Bottle Jackets Of Sulfur Furnace - Fabrication , Making And Installing Drum Type Sulfur Furnace - Fabrication , Cutting Out The Corroded Save All And Making And Fitting It With A New Plate - Fabrication , Modify The Juice Sulfiter By Reducing The Cell Diameter As Per The Drawing - Fabrication , Removing The Screen Of Old Dsm And Fitting A New One And Replacing Its Wornout Frame - Fabrication , Removing The Wornout Mixed Juice Spreader Installed In The Mill And Installing A New One As Per The Instructions - Fabrication , Cleaning All The Tubes Of The Transient Heater And Giving Hydraulic Testing - Fabrication , Replacement And Straighthening Of Wornout Plate Of Unloader Trolley - Fabrication , Cutting Out The Corroded Juice Tray Of Mill And Installing A New One And Giving Satisfactory Trial - Fabrication , Installing Guides On Both Sides Of The Chain Near The Cutter In The Cane Carrier - Fabrication , Making And Replacing Of Wornout Suit With New One Of Cane Carrier - Fabrication , Dismantling The Wornout Catcher Of The Quad S Fourth Body And Making And Installing Its With New 8 Mm Plate - Fabrication , Removing Old And Damaged Gear Of Vacuum Crystallizer And Installing New Gear Doing Alignment And Giving Satisfactory Trial - Fabrication , Making And Installing The Oil Tray Of Mill House With New One. - Fabrication , Making New Frame Of Inter Carrier Using 8 Mm Plate And Angle And Channel - Fabrication , Straightening Of Wornout Columns Of Cane Carrier And Bagasse Carrier Approx 2 Fit Hight - Fabrication Total Quantity : 80
|