Grw Külbingen - Wicklesgreuth Earthworks: Soil Homogeneous Area B1 B. Loosen X1, Install According To Profile Approx. 720 M³ Loosen Soil Retention B1 B. Loosen X1, Install According To Profile Approx. 690 M³ Build A Corrugated Steel Construction Pit, Temporarily Store Approx. 2,795 M³ Of Soil Laterally Gelled. Improve Floor Construction. Passage And Reinstall Approx. 1030 M³ Supply And Installation Of Corrugated Steel Culvert L~42 M (Sole) Unbound Layers: Frost Protection Layer 0/45 Construction Site Bypass D=0.46 Approx. 650 M³ Frost Protection Layer 0/45 Substructure Construction Site Bypass Approx. 1,345 M³ Frost Protection Layer D=0.43 Approx. 155 M³ Installation Of Asphalt: Asphalt Binder Course Ac 16 B S Approx. 75 Tons Asphalt Base Course Ac 22 T S Lime Chippings Approx. 360 M² Asphalt Base Course Ac 22 T N Approx. 3,760 M² Asphalt Base Course Ac 22 T N Approx. 535 Tons Asphalt Surface Layer Ac 8 D N Approx. 2,730 M² Asphalt Surface Course Ac 5 D L Approx. 3,690 M² Asphalt Surface Layer Sma 8 S 350 M²
Contact Information
Address
Würzburger Landstraße 22, 91522, Ansbach
Email
vergabestelle@stbaan.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112468828
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.