|
1. The Subject Of The Order Is The Construction Of Ul. Wilkowyjska In Tychy, Together With The Necessary Technical Infrastructure, Including Road Works And Industry Works, In Particular: • Construction And Reconstruction Of The Road, • Construction Of Sidewalks, Exits And Roadsides, • Construction Of A Road Drainage System With Storm Sewage, • Construction Of A Technological Canal, • Construction And Reconstruction Of The Land Infrastructure Network (Water Supply, Gas, Electricity), • Construction Of Street Lighting, • Implementation Of Road Traffic Safety Elements, • Execution Of Works Finishing And Greenery Development. The Works Should Be Carried Out In Accordance With The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works, Applicable Standards And Legal Regulations, And In Accordance With The Conditions And Agreements Of The Network Administrators. The Investment Includes: • A Road Approximately 447 M Long, 5.0 M Wide And With An Area Of 2,310 M² • A Sidewalk 2.0–2.5 M Wide And An Area Of 825 M² • Side Roads With A Width 3.5–4.5 M And An Area Of 300 M²• Roadsides With A Width Of 0.75–1.25 M And An Area Of 300 M²• Green Areas With An Area Of 944 M².1.1. Scope Of Works: 1.1.1. Preparatory Works, Including: • Measurement And Geodetic Works, • Introduction Of Temporary Traffic Organization, • Securing The Construction Site, • Ensuring Industry Supervision, • Performing An As-Built Geodetic Inventory, • Performing A Video Inventory Of The Storm Sewage System.1.1.2. Works Related To The Preparation Of The Area, Including: • Felling Of Trees And Bushes, Grubbing Up Of Stumps And Removal Of Stumps, Branches And Logs Along With Their Disposal. The Administrative Decision Authorizing The Felling Of Trees Has Expired. Currently, Proceedings Are Underway To Obtain A New Permit. The Lack Of The Decision In Question Does Not Prevent The Commencement Of Construction Works, Provided That The Works Related To Cutting Down Trees Can Only Be Carried Out After Obtaining An Appropriate Permit, Which Should Be Included In The Schedule. The Attached Documentation Includes A Draft Decision.• Manual Removal Of Bushes And Undergrowth,• Securing Existing Trees For The Duration Of The Works.1.1.3. Road Works, Including: • Demolition Of Existing Infrastructure And Earthworks, • Construction Of Road Surface Structures, Sidewalks, Exits And Roadsides, • Construction Of Curbs And Edges, • Construction Of Surface Drainage.1.1.4. Stormwater Sewerage And Drainage, Including: • Construction Of A Stormwater Drainage System, • Installation Of Street Inlets, • Construction Of Inspection Wells, • Construction Of A Retention Reservoir, • Construction Of A Rainwater Pumping Station, • Construction Of A Sewage Outlet To The Receiver, • Construction Of Drainage. The Tyski (Wilkowyjski) Stream Is The Receiver Of Stormwater.1.1.5. Piping The Ditchthe Existing Road Ditch Is Planned To Be Piped Using Pehd Dn600 Pipes Along With The Constru
|