Construction Of Długa Street In Urle, Jadów Commune. The Scope Of The Investment Includes The Following Elements: Road And Sidewalk Construction Works, Expansion Of The Sanitary Sewage System, Removal Of Conflicts With The Lv Power Line, And Expansion Of Street Lighting, Construction Of A Service Channel, Reconstruction Of Existing Fences. Characteristics Of The Road Section Elements: Asphalt Concrete Roadway With A Length Of 658.25 M. 5.0 M Wide With Local Widening To 5.80 M (2 Lanes Of 2.5 M Each), Concrete Pavement, 658.25 M Long And Min. 2.0 M At The Right Edge Of The Road. Roadside Made Of Crushed Aggregate, 0.75 Cm Wide, On The Left Side, 658.25 M Long. Two Intersections With Other Municipal Roads. Turning Area With Dimensions Of 12.5 By 12.5 M. Road Surface Structure: Wearing Surface Asphalt Concrete Ac 11S Kr-2 Thickness. 4 Cm, Binding Width For Ac 16W Kr-2 Asphalt Concrete, Thickness 5 Cm, Lower Foundation Layer Made Of Mechanically Stabilized Crushed Stone Aggregate 0/31.5 C 90/3 Gr. 10 Cm, Auxiliary Base Made Of Unbound Aggregate 0/63 - 25 Cm, Sidewalk: Abrasive Concrete Cubes Thickness. 8Cm, Cement-Sand Bedding 1:4 Gr. 3 Cm, Base Base Made Of Crushed Concrete Aggregate 0/63 - 20 Cm, Individual Slopes Made Of Cubes: Abrasive Concrete Cubes Thickness. 8Cm, Cement-Sand Bedding 1:4 Gr. 3 Cm, Main Base Made Of Crushed Concrete Aggregate 0/63 - 20 Cm, Individual Aggregate Ramps: 0/31.5 Stone Thick. 10 Cm, Main Base Made Of Crushed Concrete Aggregate 0/63 - 20 Cm, Public Access Roads: Wearing Depth, Asphalt Concrete Ac 11S Kr-2 Thickness. 4 Cm, Binding Width For Ac 16W Kr-2 Asphalt Concrete, Thickness 5 Cm, Lower Base Layer Of Mechanically Stabilized Crushed Stone Aggregate 0/31.5 - 10 Cm, Auxiliary Base Layer Of Unbound Aggregate 0/63 - 25 Cm, Roadsides: Mechanically Stabilized Crushed Stone Aggregate 0/31.5 Gr. 15Cm. Drainage Surface Roads In Addition To Road Works, It Is Planned To Supplement The Sanitary Sewage System, Rebuild Conflicts With The High-Voltage Network, Water Supply Network Devices And The Existing Sanitary Sewage System, And Build A Street Lighting Line.2. The Scope Of Works Also Includes: - Felling Of Trees And Shrubs Under The Supervision Of The Ordering Party In Accordance With The Inventory Of Greenery And Protocolized Transfer Of The Tree To The Place Indicated By The Ordering Party, - Preparatory, Demolition And Reconstruction Works Of Fences, - Introduction Of Permanent Traffic Organization, - Finishing Works, - Preparation Of An As-Built Surveying Inventory,
|