The Subject Of This Order Is The Construction Of A Pedestrian And Bicycle Path And A Bicycle Path Located Along The District Road No. 2521G Człuchów - Polnica - Provincial Road No. 212 As The Second Stage Of Implementation, On The Section From Km 5+188 To 12+070 And From 12+138 To 12+570 With A Total Length Of 7,314 Meters Along With Accompanying Elements. The Road Route Runs In Undeveloped Areas Through Forests And Wastelands And In Built-Up Areas In The Town Of Polnica. The Route Connects The Town Of Kiełpinek With The Town Of Polnica. The Investment Will Include: • A Pedestrian And Bicycle Path, A Bicycle Path And A Pedestrian, Bicycle And Road Section, • Two Bicycle Traffic Service Areas (Morr), • Reconstruction Of Exits, • Reconstruction Of Drainage Elements And Restoration Of Ditches, • Reconstruction Of The Existing Culvert At Km 7+195, • Construction Of Lighting For Four Pedestrian Crossings, Including Two With Lighting Of The Transition Zone, • Construction Of Pedestrian Roads In The Town Of Polnica, • Construction Of A Bus Bay With A Platform, • Vertical And Horizontal Markings And Road Traffic Safety Elements, • Land Development Necessary For The Implementation Of The Investment. The Task Is Planned To Carry Out Construction Works, Such As: Preparation Of The Area, Construction Of A Roadbed, Substructure, Bituminous Works, Installation Of Vertical Markings And Road Safety Devices, Execution Of Horizontal Markings, Drainage Works And Finishing Works. The Current Investment Does Not Require The Removal Of Trees And Bushes. The Road For Pedestrians And Bicycles Has Two Types Of Surface - Different Depending On The Area Through Which It Leads, I.E. Asphalt - Non-Urban And Urban Sections (Polnica) And Aggregate Mixture - Forest Sections (In Accordance With The Recommendations Of The State Forests). In The Town Of Polnica, At Km 11+005 To 11+185, The Surface Of The Bicycle Road Is Red Asphalt. The Roadsides Will Be Made Of Kł 0-31.5 Mm, Exits Will Be Of Bituminous Construction, Pedestrian Crossings Will Be Made Of Textured Tiles, A Bus Bay With A Surface Of Irregular Stones And A Platform Of Concrete Cubes. Morr Has An Area Of Approx. 40 M2, Concrete Block Surface. The Equipment Includes: Bicycle Racks, 2 Pcs. Each With Min. For 5 Bicycles, Wooden Park Benches With Backrests - 2 Pcs., Steel Waste Bins On A Metal Post -2 Pcs., Bus Shelter 3.6 M X 1.2 M - 1 Pc., Information Board (About The Region) - 1 Pc.)
|