|
..Supply And Placement Of Work Sign In Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1.25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two (2) Coats., ...Mobilization And Demobilization Of Work In Urban Center Or Nearby Region With A Value Between 1,000,000.01 And 3,000,000.00, Topographic Lease For Up To Twenty (20) Reference Points, Including Stake (Picket) Marking..., Surface Sweeping To Execute Asphalt Coating., Transport With 30000 L Asphalt Material Transport Tank Truck, On Paved Urban Road, Additional For Dmt Exceeding 30 Km..., 04/29/2026 - 11:17:08, 04/29/2026 - 13:29:12, Dmt Up To 30Km (Unit: Txkm). Af_07/2020, Connection Painting (Execution And Supply Of Bituminous Material, Exclusive Transport Of Bituminous Material)..., Additional For Dmt Exceeding 30 Km (Connection Painting), Dmt Up To 30Km (Unit: Txkm). Af_07/2020 (Connection Painting), Connection Painting (Supply Of Bituminous Material To The Works) - Asphalt Emulsion - Rr-1C, Execution Of Pavement With Asphalt Concrete Application, Bearing Layer - Exclusive Cargo And Transport..., Transport With 14 M³ Dump Truck, On Additional Paved Urban Road For Excess Dmt 30 Km..., *Transportation With 14 M³ Dump Truck, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Accessibility Ramp In Concrete Molded In Place, On A New Sidewalk With A Width Greater Than Or Equal To 3.00 M, Fck 25Mpa, With Podotactile Floor. Af_03/2024, Fiber Regulation Board, D = 0.60 M - Retroreflective Film Type I + Si - Supply And Implementation., Supply And Installation Of Wooden Support For Signage Boards, On The Ground, With H= 2.0 M And Section Of 7.5 Retroreflective Paint Based On Acrylic Resin With Glass Microspheres, E = 30 Cm, Manual Application.
|