1) The Subject Of The Order Is The Expansion And Modernization Of The Hydrophore Plant In Kliczkowy. Scope Of Work: Construction Of A New Single Drinking Water Intake S3, Installation Of Two Retention Tanks In The Vicinity Of The Station Building And The Necessary Execution Of External Water Supply, Sewage And Electrical Installations, Installation Of A Set Of Technological Devices Allowing For Water Treatment And Its Distribution To The Network, Installation Of A Reserve Electricity Supply (New Generator Generator), Modernization Of The Existing Hydrophore Building Through Comprehensive Thermal Modernization, Installation Of External Lighting With An Alarm, Cameras And A New Fence, Restoration Of The Green Area To Its Original State. Notes! A Drinking Water Intake Must Be Completed By July 15.2) According To The Common Procurement Vocabulary (Cpv), The Subject Of The Order Covers The Scope Defined By The Codes: 45453000-7 - Renovation And Renovation Works, 45400000-1 - Finishing Works In The Field Of Buildings, 45252120-5 Construction Works In The Field Of Water Treatment Plants, 45310000-3 Electrical Installation Works, 45231300-8 Construction Works In The Field Of Construction Of Waterworks And Sewage Disposal Pipelines, 45232430-5 Works In The Field Of Water Treatment, 45262220-9 Drilling Water Wells.3) The Contractor Is Obliged To Compare The Compliance Of The Submitted Studies And In The Event Of Any Discrepancies, He Is Obliged To Request An Explanation From The Ordering Party As Soon As Possible In Writing. In The Event Of Differences In Technological Solutions (Including The Materials And Devices Used), The Solutions Presented In The Construction Design, Bills Of Quantities And Additional Descriptions Shall Apply First.4) To Perform The Order, The Contractors Are Obliged To Use New Materials And Devices, Grade I, Purchased From Reputable Manufacturers, Guaranteeing The Highest Quality, With Technical And Quality Parameters Not Worse Than Those Specified In The Bills Of Quantities. The Names, Types And Origins Of Products Appearing In The Studies Are Not Binding On The Contractors. 5) To Complete The Order, The Contractors Are Obliged To Use Equipment And Materials That Meet The Requirements Of The Polish Standard Transposing The European Standard Pn-En (Harmonized Standards) And Others Specified In The Technical Specification For The Execution And Acceptance Of Construction Works And Design Documentation. The Contractor Is Obliged To Have Documents For The Materials And Devices Used That Allow Their Use In Construction (Attestations, Certificates, Declarations Of Conformity, Quality Certificates). 6) Where The Origin (Brand, Trademark, Manufacturer, Supplier) Of Materials Or Standards Referred To In Art. Is Indicated In The Drawings, Documentation Or Description Of The Subject Of The Order. 101 Section 1-3 Of The Public Procurement Law, The Ordering Party Allows The Offer Of Materials Or Equivalent Solutions. The Concept Of Equiva
|