|
Heating, Ventilation And Air-Conditioning Installation Work – Heizung. Heat Supply Using Air-Water Hp 40 Kw, 500 Liter Buffer Storage, System Protection With Pressure Maintenance/Degassing, Make-Up Device Including Membrane Expansion Tanks, Softening Valve, Heating Distributor Thermally Separately Insulated For 4 Heating Groups Including Pumps, Fittings, Heat Meters And Thermal Insulation. Various Fittings And Components: Including 6 Pumps, Approx. 30 Butterfly Valves Up To Dn 50, 5 Non-Return Valves Up To Dn 50, 4 Dirt Traps Up To Dn 50, Ball Valves Up To Dn 25, 16 Dial Thermometers, 10 Pressure Gauges, 8 Air Pots, 4 Heat Meters, As Well As Several Branch Valves, Installation Of Msr Valves, Piping Black Steel Pipe, Welded Up To Dn 50 Approx. 110 M + Fittings And Thermal Insulation, Multi-Layer Composite Pipe On Rfb Up To Dn 32 Approx. 160 M. Approx. 10 Fire Barriers For Supply Lines, Various Labels, Emptying And Filling, Leak Testing, Valves For Underfloor Heating With Approx. 7,000 M Of System Pipe For Surface Heating, Approx. 1,000 M2 System Composite Roll, Approx. 15,000 Stapler Clips, Approx Compression Ring Fitting, Pipe Guide Elbow, Protective Sleeves + Other Components 7 Heating Circuit Distributors And Distribution Cabinets Up To 12 Heating Circuits, Mobile Heating Center For Screed Heating Up To 25 Kw, Mobile Construction Heating 50 Kw, 2 Mobile Air Heaters 25 Kw Incl. Connecting Lines And Fuel Supply Mobile Scaffolding, Plastic Labels/Stickers Etc. Maintenance Services For 4 Years
|