The Subject Of The Order Is The Execution Of Construction Works Consisting In The Expansion Of District Road No. 2154P By Building A Pedestrian Road (Sidewalk) With Exits, Drainage Elements, Reconstruction Of Accompanying Infrastructure And The Implementation Of Road Traffic Safety Elements. The Total Length Of The Designed Section Is 313.0 M2. Scope Of Worksconstruction Of A Pedestrian Route, Construction Of A Sidewalk With A Surface Made Of Gray Concrete Cubes, Width Of The Sidewalk: 1.80 M (Sections Moved Away From The Road), 2.30 M (Sections Adjacent To The Road), Separating The Sidewalk With A Concrete Edge 8 × 30 × 100, Local Widenings And Adaptations To The Existing Infrastructure, Construction Of An Access Road To The Property (Plot No. 116/3), Connection With The Existing Sidewalk. Pedestrian Crossings And Traffic Organization Construction Of A Pedestrian Crossing In The Area Of Ul. Lawendowa With A Waiting Zone (2.0 M Wide, Red Cubes), Construction Of The Passage Suggested In Ul. Jaśminowa (Km 0+065.0), Construction Of A Pedestrian Crossing At Km 0+230.0 (Ul. Jaśminowa), Construction Of The Crossing Suggested In Ul. Jałowcowa (Km 0+313.0), Construction Of Vertical And Horizontal Markings. Construction And Reconstruction Of Exits, Construction Of Individual Class D Exits To The Property, Surface Made Of Graphite-Colored Concrete Cubes, Separation Of Exits: O With On-Ramp Curbs From The Road Side, O With Edges On The Property Side, Construction Of A Special Exit At Km 0+175.0 (Resistor Sunken), Demolition Of Existing Exits (Cubes, Slabs, Stone), Construction Of An Additional Exit To Plot No. 116/2. Road And Accompanying Works, Construction Of A Curb Sewer (Km 0+060.0 - 0+113.0), Reconstruction Of The Road Surface (Wearing Layer), Reconstruction Of The Intersection Geometry (Curve Radius R = 8.0 M), Construction Of Roadsides Paved With Aggregates, Construction Of Green Belts. Drainage Surface Drainage Through Slopes Into Green Areas And Roadsides, Construction Of A Curb Sewer, Replacement Of An Inlet Manhole (H = 1.5 M, Class D400), Installation Of Paving Around The Inlet, Replacement Of A Sewer Using The Trenchless Method (Pp Sn8 Dn160, L = 7.5 M).Lighting And Traffic Safety Lighting Of Passages For Pedestrians - Solar-Wind Lamps: O Km 0 + 000.0 (Ul. Lawendowa), O Km 0 + 230.0 (Ul. Jaśminowa), Reconstruction And Protection Of Infrastructure, Height Regulation Of Land Development Elements (Gates, Wells, Covers), Protection Of Cables With A110ps Double Pipes, Preservation Of The Existing Geodetic Network And Drainage Devices, Taking Into Account The Existing Networks: Water Supply, Gas, Energy, Sewage And Telecommunications. Demolition And Reconstruction Works Disassembly Of Existing Surfaces At Exits, Disassembly And Reconstruction Of The Fence: O Length: 52.0 M, O Galvanized Steel Mesh (H = 1.5 M), O Posts Every 2.5 M. Archaeological Requirements The Investment Area Is Lo
|