|
Lot 1 - Installation Of Split Air Conditioning 9,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 3 Meters., Lot 1 - Installation Of Split Air Conditioning 12,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 3 Meters., Lot 1 - Installation Of Split Air Conditioning 18,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 3 Meters., Lot 1 - Installation Of Split Air Conditioning 24,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 3 Meters., Lot 1 - Installation Of Split Air Conditioning 30,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 3 Meters., 04/27/2026 - 11:46:13, 04/27/2026 - 11:46:14, Lot 1 - Installation Of Split Air Conditioning 36,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 3 Meters., Lot 1 - Installation Of Split Air Conditioning 24,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 7 Meters., Lot 1 - Installation Of Split Air Conditioning 30,000 Btus - Ground Floor. With Supply Of All Necessary Material For Installation And Operation. Piping Of Up To 7 Meters, Lot 1 - Uninstallation Of Split Air Conditioning 9,000 Btus - Ground Floor, Lot 1 - Uninstallation Of Split Air Conditioning 12,000 Btus - Ground Floor, Lot 1 - Uninstallation Of Split Air Conditioning 18,000 Btus - Ground Floor, Lot 1 - Uninstallation Split Air Conditioning 24,000 Btus - Ground Floor, Lot 1 - Uninstallation Of Split Air Conditioning 30,000 Btus - Ground Floor, Lot 1 - Uninstallation Of Split Air Conditioning 36,000 Btus - Ground Floor, Lot 1 - Preventive Maintenance - Split Air Conditioning 9,000 Btus, Installed In Ground Floor. Cleaning/Complete Sanitization Of The Equipment (Evaporator And Condenser), Analysis Of Connections, Inspection Of Metallic Parts And Pipes, Removal Of Vibrations And Noises Arising From Fixing The Device, Checking The Refrigerant Gas Level. An Adhesive Label Must Be Affixed To The Equipment With The Date Of Maintenance Performed And Company Identification., Lot 1 - Preventive Maintenance - Split Air Conditioning 12,000 Btus, Lot 1 - Preventative Maintenance - Split Air Conditioning 18,000 Btus, Lot 1 - Preventive Maintenance - Split Air Conditioning 24,000 Btus, Refrigerant Gas Level Check. An Adhesive Label Must Be Affixed To The Equipment With The Date Of Maintenance Performed And Identification Of The Company Responsible., Lot 1 - Preventive Maintenance - Split Air Conditioning 30,000 Btus, Lot 1 - Preventive Maintenance - Split Air Conditioning 36,000 Btus, Lot 2 - Installation Of Split Air Conditioning 9,000 Btus - Above The Ground Floor, With Risk Of Falling. Included Is The Supply Of All Necessary Materials For Installation And Operation. Piping Of Up To 3 Meters., Lot 2 - Installation Of Split Air Conditioning 12,000 Btus - Above The Ground Floor, Lot 2 - Installation Of Split Air Conditioning 18,000 Btus - Above The Ground Floor, Lot 2 - Installation Of Split Air Conditioning 24,000 Btus - Above The Ground Floor, Lot 2 - Split Air Conditioning Installation 30,000 Btus - Above
|