|
Engineering Design Services – Project Documentation - Increasing The Cyber Security Of Technological Networks. The Subject Of Performance Is The Development Of Project Documentation For The Implementation Of A System Of Central Monitoring Of Networks And Ics Systems Of Emo12, Mo34, Ebo, Ve, Eno And Evo Locations. The Central Monitoring System Will Be Common To All Locations, But The Project Documentation Will Be Developed For Each Location Individually, At Least In The Following Scope: - Implementation Project (Developed For Each Location Separately), - Schedule Or Time Estimate Of The Duration Of The Implementation Stages And Individual Work, Control And Test Activities, - Technical And Commercial Specification (Tos), In Which The Complete Supply Of Hw And Sw Will Be Defined In Detail, Including The Scope Of Necessary Work And Prices, - Technological Assembly Procedure, - Risk Assessment From The Performance Of Work (As A Separate Document), - Bpp Safe Work Procedure (Developed For Each Location Separately), - Health And Safety Plan, - Waste Management Plan, - Pks Inspection And Test Plan, - Pkv And Kv Test Programs, - Procedure For Putting The Monitoring System Into Operation, Including The Procedure For Its Configuration And Procedures In The Process Of Learning The System, - Regulations For The Operation, Operation And Maintenance Of The System And Supplied Equipment, Including Incident Response Procedures, - Documentation Resulting From The General Safety Standards Of Slovenské Elektrárne, A.S. In The Field Of Cyber Security, Architectural And Technological Ics Standards, Including The Document Cyber Security, - Proposal For Revisions Of Parts Of The Customers Operational Documentation Affected By The Project Change, Especially Technological Operational Regulations, Architecture Diagrams And Topology Of The Affected Ics Systems Depending On The Project Solution Of The Contractor, - Documentation For The Fire Safety Of The Building, Assessment Of The Impact Of The Implementation On The Change In The Nature Of Fire Safety Or The Increase In The Fire Load Of The Building - In Case It Results From The Project Solution Supplier. The Developed Project Documentation For The Implementation Will Primarily Include: - A Detailed Assessment Of The Individual Networks And Ics Systems Of The Emo12, Mo34, Ebo, Ve, Eno, Evo Locations In Order To Design A Technical Solution And Implement Suitable Sw Tools For Central Monitoring Of The Operation And Security Of Ics Technological Networks, - A Technical Solution For The System Of Central Monitoring Of The Operation And Security Of Ics Technological Networks, - A Technical Solution For The Necessary Modifications Of The Affected Networks And Ics Systems For Their Connection To The Monitoring System, - Technical Solution For Connecting The Affected Ics To The Monitoring System. The Aim Of The Given Project Is To Create A System Of Central Monitoring Of The Operation And Safety Of Technological Networks Of Ics Industrial Control Systems With The Detection Of Potential Cyber Security Threats, Which Will Monitor The Connected Ics Of The Emo12, Mo34, Ebo, Ve, Eno And Evo Locations. By Introducing Central Ics Monitoring, An Increase In The Level Of Ics Cyber Security Of Individual Locations Will Be Achieved, Fulfilling The Requirements Of The Current Legislation S
|