|
Drinking-Water Treatment Plan Construction Work – Renewal And Expansion Of The Halle-Beesen Waterworks | Awarding Of General Contractor Services. The Subject Of The Contract Is The Provision Of All Services And Work For The Modernization, Renovation And Reactivation Of The Halle-Beesen Waterworks As A Peak-Load Waterworks, Including The Addition Of A Softening System Based On Reverse Osmosis, As General Contractor. The Contractor Bears Overall Responsibility For Planning, Procurement, Construction And Commissioning And Is Responsible For The Overall Service Ready For Use. The Measure Includes The Recommissioning Of The Waterworks, Which Has Been Closed Since November 2007, By Converting Existing Buildings, Building A New Pure Water Tank And Installing Completely New System Technology In The Raw Water Pumping Station, Sand Filtration, Uf/Ak/Caco3, Reverse Osmosis Building, Pure Water Tank, Rinse Water Treatment And Wastewater Pumping Station. The Scope Of Services Includes, Among Other Things: - Planning And Engineering: Implementation Planning Based On The Existing Design And Approval Planning As Well As Work, Assembly And Detailed Planning For All System Parts And Trades, Including The Control Descriptions And Process Documentation Required For Programming By The System Manufacturer. - Process Engineering Equipment: Delivery, Assembly And Commissioning Of The Complete System Technology, Including Ultrafiltration Stage, Activated Carbon Stage, Calcium Carbonate Stage, Reverse Osmosis System, Rinse Water Treatment And Raw Water Pumping Station, Each Including The Associated Containers, Pumps, Fittings And Dosing Components. - Pipeline Construction And Civil Engineering: All Pipeline Work Within The Buildings, Pressure Pipelines Between The Buildings, Drainage Canal Work, Dirty Water Pumping Stations As Well As Cable Laying And Empty Pipe Routes Outside. - Electrical, Ems And Control Technology Including It Security: Delivery, Assembly And Commissioning Of The Entire Electrical, Ems And Control Technology, Including Medium And Low Voltage Supply, Emergency Power Supply (Emergency Power System As A Container Solution), Uninterruptible Power Supply For Process-Critical Consumers, Automation, Plc Structure, Hmi As Well As Redundant Telecontrol And Control Technology Connection. The Requirements Of Bsi-It-Grundschutz, Iec 62443, Eu-Nis2 And B3s Water Must Be Adhered To. - Heating, Ventilation And Plumbing: Delivery, Assembly And Commissioning Of The Hls And Rlt Systems In All Affected Buildings. - Metal Construction And Steel Construction: Delivery, Production And Assembly Of Grating Platforms, Stairs, Railings, Ladders, Crane Runways, Support Structures As Well As Supporting Structures For Pipelines And System Components. - Finishing Trades: Roof And Facade Work, Lightning Protection, Photovoltaics, Doors And Windows (Including Fire And Smoke Protection Doors), Plastering, Painting, Screed And Floor Covering Work In All Affected Buildings. - Outdoor Facilities: Dismantling And Dismantling Services, Earthworks, Drainage And Fencing Work Including Gates And Fencing. - Commissioning And Pro
|