|
Office Block Construction Work – Construction Of An Extension Building For The Ahrweiler District Administration. Construction Of Administration Building As A Wooden Structure With Reinforced Concrete Support Structure On A Bored Pile Foundation Gri Without Parking Spaces, Approx. 2600M3 With 4 Floors Ground Floor (Parking Zone Area), 1St Floor, 2Nd Floor And 3Rd Floor As Well As A Basement Room As A Technical Area With Approx. 55M3 Bri. Preparing The Construction Site Consisting Of Preparing The Subgrade For Pile Drilling Work, Construction Site Equipment (2 To 3 Containers, 1 Crane, Construction Site Fence 250 M Construction Site Fence, Partly In Wooden Construction, Site Power Facility, Site Water Facility And Site Lighting) Bored Pile Work 42 Pieces D90cm Approx. 520M And D120cm Approx. 100M, Kelly Drilling With Pipes, Construction Pit Production (Approx. 2800M² Excavation For Head Beams, Basement And Tg Entrance Sloped) Reinforced Concrete Work (Approx. 110M² Floor Slabs, Approx. 1600M² Reinforced Concrete Ceilings, 360M2 Prestressed Concrete Ceiling Elements 20 Pieces Of Deep Foundation With Well Rings, Approx. 120 M Element Walls With Core Insulation, Retaining Wall At Tg Entrance, Tg Ramp Construction As Reinforced Concrete Version, Approx. 900M² Clean Layer, Approx. 1000 M² Reinforced Concrete - Walls, Wall-Like Supports, Parapets, Elevator Walls, Stairwell Walls, Approx. 260M Reinforced Concrete Supports And Other Various Concrete Parts, Earthing And Lightning Protection Lines, Empty Electrical Pipes, Empty Boxes In Concrete Components, Underground Lines, Empty Pipes, Sewer Components In The Outside Area Between The Pile Foundations, Masonry Work (40M² Non-Load-Bearing Walls Made Of Sand-Lime Brick) Basement And Foundation In Waterproof Construction With Joint Tapes. Some Sealing Work With Perimeter Insulation On Foundations, Floor Slabs, Supports.
|