|
Works For Complete Or Part Construction And Civil Engineering Work – 26Ип-Ч19а028 Repair And Restoration Activities At Nek Ead Facilities. The Subject Of This Order Is The Implementation Of Repair And Restoration Activities At Sites Managed By Nek Ead Located In The Territories Of The Sofia Region And The Regions Of Blagoevgrad, Burgas, Varna, Veliko Tarnovo, Kardjali, Montana, Pazardzhik, Pleven, Plovdiv, Smolyan, Sofia, Stara Zagora, Haskovo. The Assignment Of A Specific Object Is Carried Out By Sending A Written Notification From The Contracting Party To The Contractor, Specifying The Location Of The Object, The Type, Volume Of Activities (Works) And The Maximum Period Of Execution. Within A Period Of Up To 5 Working Days, Starting From The Date Of Sending The Written Notification, The Contracting Authority Shall Hand Over The Work Site For The Relevant Site To The Contractor. Work On The Assigned Object Begins After The Signing Of The Protocol For The Handover Of The Work Site By The Employer To The Contractor, According To The Employers Model. The Construction And Installation Works (Smr) Assigned With Specific Orders For Each Individual Site Will Mainly, But Not Only, Be Expressed In The Following Activities (Works): Application Of Energy Efficiency Measures - Replacement Of Windows, Thermal Insulation Of External Walls, Thermal Insulation Of Roofs, Replacement Of Old Cng Lighting Fixtures With Esl, Measures For Building Heating Installation - Replacement Of Building Installation And Heating Fixtures; Measures For Automatic Control Of The Heating Installation; Implementation Of Activities Prescribed In The Technical Passport Of The Building, Related To Constructive Restoration/Strengthening Of The Building; Implementation Of Construction/Replacement Activities Of Lightning Arresters And Grounding Installations; Implementation Of Roof Repair Activities, Including Replacement Of Roof Tiles, Skylights, Slat Grill, Sheathing Around Skylights, Chimneys And Ulamas, Repair Of Wooden Sheathing, Etc.; Replacement Of Downpipes And Gutters, Discharge Into An Underground Storm Sewer, Waterproofing Of Basement Walls And/Or Construction Of Drainage Around The Building If Proven Necessary; Implementation Of Activities Related To Ensuring Safety In Case Of Fire In The Buildings - Construction Of A Fire Alarm System, Evacuation And Emergency Working Lighting, Construction Of An Internal Fire-Fighting Plumbing System, Incl. Fire Cartridges If Necessary, Etc.; Implementation Of Activities To Ensure An Accessible Architectural Environment For People With Disabilities - Reconstruction Of An Elevator, Remodeling Of Sanitary Premises That Meet Accessibility Requirements, Construction Of Ramps/Lifting Platforms, Etc., Which In Turn Include: Dismantling Works, Masonry, Plastering And Painting Works; Cladding Works And Facade Joinery; Flooring; Other Finishing Works; Carpentry Works; Insulation Works - Waterproofing, Thermal Insulation And Steam Insulation; Installation Works - Plumbing, Electrical And Hvac; Others.
|