|
Lot 01 - Basic Monthly Preventive Maintenance Of Acj From 7,000 To 30,000 Btus (Air Filter Cleaning And Application Of Antifungal And Antibacterial Spray), Lot 01 - Basic Monthly Preventative Maintenance Of Splits From 7,000 To 24,000 Btus (Cleaning Of Air Filters, Tray, Drain, Coil, Removal Of Biofilm With Application Of Antifungal And Antibacterial Spray), Lot 01 - Basic Monthly Preventative Maintenance Of Splits From 28,000 To 60,000 Btus (Cleaning Of Air Filters, Removal Of Biofilm With Application Of Antifungal And Antibacterial Spray), Lot 01 - Preventive Maintenance Quarterly General Acj From 7,000 To 30,000 Btus (Sanitization Of Coils, Fan With Sanitization With Anti Bactericide Aroma Bac 0+ And More Application Of Antifungal Spray; Chemicals, Sources Of Excessive Heat Radiation, And Sources Of Generation Of Microorganisms), Lot 01 - Quarterly General Preventive Maintenance Of Split From 7,000 To 12,000 Btus (Hygiene In Split Air Conditioner With General Maintenance Of The Evaporator, Fan, Thermo-Acoustic Insulation, Drain With Master Plus Refri, Sanitation With Anti Bactericide Aroma Bac 0+ And More Application Of Antifungal Spray; Químicos, 24/04/2026 - 13:22:33, 04/24/2026 - 13:22:35, Lot 01 - Quarterly General Preventative Maintenance Of Split From 18,000 To 24,000 Btus (Hygiene In Split Air Conditioner With General Maintenance Of The Evaporator, Lot 01 - Quarterly General Preventive Maintenance Of Split From 28,000 To 36,000 Btus (Hygiene In Split Air Conditioner With General Evaporator Maintenance, Lot 01 - Installation Of Acj From 7,000 To 30,000 Btus, Lot 01 - Installation Of Split From 7,000 To 9,000 Btus Including (Copper Tube, Sponge Tube, Pp Cable 4 X2, 5, Pair Of Brackets, Screws, Nut, Washers, Shock Absorbers, Blackout Tape Rob, Bushings And Clamps), Lot 01 - Installation Of The 12,000 Btus Split Including (Copper Tube, Lot 01 - Installation Of The 18,000 To 24,000 Btus Split Including (Copper Tube, Lot 01 - Installation Of The 12,000 Btus Split 30,000 To 36,000 Btus Including (Copper Tube, Lot 01 - Uninstallations Of Wall-Type Split From 7,000 To 30,000 Btus, Lot 01 - Uninstallation Of Wall-Type Split From 36,000 To 80,000 Btus, Lot 01 - Uninstallation Of Cassette-Type Split, Lot 01 - Corrective Maintenance Of Leaks In Split Copper Piping, Lot 01 - Service And Replacement Of R22 And R410a Refrigerant Gas With Vacuum In The Split System Of 7,000 To 9,000 Btus, Lot 01 - Service And Replacement Of R22 And R410a Refrigerant Gas With Vacuum In The Split System Of 12,000 Btus, Lot 01 - Service And Replacement Of R22 And R410a Refrigerant Gas With Vacuum In The Split System Of 18,000 Btus, Lot 01 - Service And Replacement Of R22 And R410a Refrigerant Gas With Vacuum In The Split System Of 20,000 To 24,000 Btus, Lot 01 - Service And Replacement Of Refrigerant Gas R22 And R410a With Vacuum In The Split System From 28,000 To 30,000 Btus, Lot 01 - Refrigerant Gas Service And Replacement 7,000 Btus, Lot 01 - Service And Exchange Of Hermetic Capacitor For 9,000 Btus Split Compressor, Lot 01 - Service And Exchange Of Hermetic Capacitor For 12,000 Btus Split Compressor, Lot 01 - Service And Exchange Of Hermetic Capacitor For 18,000 Btus Split Compressor, Lot 01 - Service Changing Hermetic Capacitor For Split Compressor 20,000 To 24,000 Btus, Lot 01 - Service And Changing He Capacitor
|