|
Lot 1 - Environmentally Adequate Demolition And Waste Management Program (Pgrcc), Lot 1 - Vegetation Cover Report, Lot 1 - Art - Technical Responsibility Note (Track 2), Lot 1 - Executed Project - As Built, Lot 1 - Use, Operation And Maintenance Manual, 04/23/2026 - 15:51:50, Lot 1 - Copies Of Project By Plot, Lot 1 - Supply And Installation Of Work Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Lot 1 - Mobilization / Demobilization Of Site, Lot 1 - Rental Of Metal Scaffolding Type Facade, Pieces Approximately 1.20 M Wide And 2.0 M High, Including Diagonals In X, Connection Bars, Shoes And Other Items Required For Assembly (Not Included Installation), Lot 1 - Assembly And Disassembly Of Modular Facade Scaffolding, With Metal Flooring, For Buildings With Multiple Floors (Excluding Scaffolding And Cleaning). Af_03/2024, Lot 1 - Rental Of Container 2, 30 Washbasin And 4 Urinals (Does Not Include Mobilization/Demobilization), Lot 1 - Dining Room Container 12.12X2, 44X2, 57 W/5 Tables/Benches/Sink, Lot 1 - Unfinished Warehouse Container. With Shelves 6, 05X2, 57, Lot 1 - Temporary Installation Of Water/Light/Power/Sewage, Lot 1 - Container Mobilization, Lot 1 - Container Demobilization, Lot 1 - Siding With Metallic Tile. Af_03/2024, Lot 1 - Stalls In Wooden Boards, 04 Modules, Dimensions Of 3.00 10X2, 20M Model Bd01, Lot 1 - Internal Wooden Scaffolding On Trestles, Lot 1 - Full Site Civil Engineer With Additional Charges, Lot 1 - Work Safety Technician With Additional Charges, Lot 1 - Construction Master With Additional Charges, Lot 1 - Day Watchman With Additional Charges, Lot 1 - Night Watchman With Additional Charges, Lot 1 - Electricity - Estimated Monthly Consumption, Lot 1 - Water And Sewage - Estimated Monthly Consumption, Lot 1 - Removal Of Metallic And Ceramic Fibercement Tiles, Manually, Without Reuse. Af_09/2023, Lot 1 - Removal Of Metallic Mesh For Roofing, Lot 1 - Removal And Transport Of Metallic Tank, Lot 1 - Demolition Of Simple Concrete Floor, Lot 1 - Demolition Of Naval Type Partitions, Lot 1 - Demolition Of Reinforced Concrete Pillars And Beams, Mechanized Using A Hammer, Lot 1 - Loading, Maneuvering And Unloading Of Rubble In A 6 M Dump Truck - Loading With Hydraulic Excavator (0.80 M Bucket / 111 Hp) And Free Unloading (M3 Unit). Af_07/2020, Lot 1 - Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Lot 1 - Leveling Surfaces Using A Motor Grader. Af_09/2024, Lot 1 - General Lease Of The Work, Lot 1 - Continuous Helix Stake, 50 Cm Diameter, Including Fck30mpa Concrete And Minimum Reinforcement (Exclusive Pumping, Mobilization And Demobilization). Af_12/2019, Lot 1 - Launching With Use Of Pump, Densification And Concrete Finishing In Structures. Af_02/2022, Lot 1 - Mobilization And Demobilization Of Equipment - Continuous Helix, Lot 1 - Manual Excavation For Crowning Block Or Footing (Including Excavation For Placing Forms). Af_01/2024, Lot 1 - Re
|