Construction Works For Power Plants And Heating Plants – Elektrodenheizkessel Reick - Los 1.2. Anlagentechnik Balance Of Plant. In Lot 1.2 “Balance Of Plant” The Technical Connection Of The Newly Built Ehk To The Central District Heating Network Is Implemented. For Pipes ≥ Dn50, Planning Is Carried Out On A Mass Basis Based On The Quantity Framework And Specifications Provided By The Client. The Batch Supplier Must Create The Workshop And Assembly Planning Based On These Specifications. Furthermore, The Lot Supplier Creates And Submits A Ce/Conformity Declaration For Its Entire Scope And Is The Distributor According To Ped For This Scope. Planning Documents Provided By The Client: • Process Flow Diagrams (P&Id) • Installation And Layout Plans • 3D Model In Nwd Format • Interface Lists • Specifications For Material Selection And Maximum Permissible Surface Temperatures Or Maximum Permissible Heat Loss • Isometrics For Pipes ≥ Dn50 • Specifications For Ps And Ts • Fitting Lists And Specifications For Process And System Components To Be Supplied. Necessary Thermal Insulation Must Be Determined Independently By The Batch Supplier And Is Part Of The Scope Of Services. If Necessary, This Also Applies To Sound Insulation. The Recipients Secondary Steel Structure Is Connected To The Buildings Primary Steel Structure Constructed On Site. The Scope Of The Secondary Steel Construction Also Includes Platforms With Access Stairs Or Ladders, If These Are Necessary In Addition To The Main Levels On Site. Steel Construction For Assembling The Brackets (E.G. Pipe Supports) Are Part Of The Scope Of Services, Including The Associated Construction And, If Necessary, Preparation And Handover Of Static Evidence. The Client Provides Steel Construction Overview Drawings As Specifications. Further Components Of The Subject Of The Order Are: • Pumps With Direct Starting • Pumps With Frequency Converters/Soft Starters • Ultrasonic Flow Measurements And Associated Evaluation Units • Analog And Digital Measurements Note: The System Of The So-Called Primary Circuit For Each Boiler Is Planned And Installed By Contractor 1.1. The Lottery Taker 1.2 Adapts Its Scope At The Interfaces Accordingly. For Small Pipes < Dn50, The Batch Supplier Takes Over The Complete Implementation, Factory And Assembly Planning For All Pipe Systems, As Well As Thermal Insulation As Required. The Batch Supplier Takes Over The Complete Factory And Assembly Planning For His Batch Size. This Includes In Particular, But Not Exclusively: • Routing And Route Planning And Dimensioning According To The Laying Concept • Creation Of Pipeline Isometrics • Determination Of Mounting And Fastening Systems • Material And Component Lists, As Well As Selection • Production Drawings And Assembly Documents • Collision Testing And Integration Into The Overall Model • Thermal And Sound Insulation As Necessary
Contact Information
Address
Friedrich-List-Platz 2
Contact No.
0351 5630 545 53
Email
robert.haentzschel@sachsenenergie.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 112186531
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.