The Subject Of The Order Is The Performance Of Construction Works Including The Implementation Of The Task Titled: Reconstruction Of The Pedestrian And Bicycle Route At Jana Pawła Ii Street In Tychy, In Accordance With The Material Scope Specified In The Cost Estimate, Simplified Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb). Material Scope Of The Order 1. Preparatory And Organizational Works, Including: • Organization And Development Of The Construction Site, • Development And Implementation Of Temporary Traffic Organization, • Geodetic Marking Of The Works, • Ensuring Industry Supervision, • Introduction And Maintenance Of Temporary Markings, • Inspection Report, Including Ediom.2. Demolition Works, Including: • Demolition Of Existing Surfaces Made Of Concrete Slabs, Edges And Curbs, Removal And Disposal Of Demolition Materials, • Dismantling Of Road Elements And Infrastructure Colliding With The Investment, Including: Bus Shelters, Benches, • Loading, Transport And Disposal Of Demolition Materials In Accordance With Applicable Regulations.3. Earthworks, Including: • Excavations And Trenching For Surface Structures, • Profiling And Compaction Of The Subsoil, • Possible Supplementation Of The Foundation, 4. Pavement Structures, Including: • Execution Of Auxiliary And Basic Bases, • Execution Of Pavement Structural Layers In Accordance With The Technology Indicated In The Cost Estimate, Stwiorb And Cross-Sectional Diagrams, - Mineral And Bituminous Surface - Approx. 620 M, - Concrete Pavement - Approx. 380 M. Due To The Route Of The Heating Main, Owned By Pec, Under The Renovated Section Of The Pedestrian And Bicycle Route, Over A Length Of Approx. 380 M From The Cassino Roundabout Towards The Olympic Roundabout, Works Related To The Construction Of A Surface Made Of Phaseless Concrete Cubes Should Be Carried Out In Consultation With Przedsiębiorstwo Energetyki Cieplnej Tychy. The Main Line In Question Is Located In A Concrete Technological Tunnel, The Ceiling Of Which Is At A Depth Of Approx. 25-30 Cm, Counting From The Upper Surface Of The Surface. Therefore, The Works Should Be Carried Out With Particular Caution And An Execution Technology Should Be Used That Takes Into Account The Existence Of The Technological Tunnel, In A Way That Eliminates The Risk Of Its Damage During The Work. • Construction Of Surface Structures For Stop Platforms, Exits For City Services And Places For Benches, Including Installation Of Integration Tiles And Directional Tiles Within Stops And Pedestrian Crossings In Accordance With Standards, • Completion Of Bituminous Surface At Curbs.5. Road And Finishing Elements, Including: • Installation Of Concrete Curbs, Concrete Ramp Curbs, Polymer Concrete Platform Curbs And Edges, The Platform Curb Should Be Built To A Height Of 16 Cm. • Vertical Adjustment Of Underground Devices (Manholes, Inlets, Valves), • Installation And Height Adjustment In Relation To The
|