|
Installation Of Floor-Ceiling Air Conditioning Devices From 30,000 To 60,000 Btus. With Support Insulating Copper Tubes Electrical Cables And Electrical Installation Of The Equipment, According To The Manufacturers Manual., Preventive Corrective Maintenance On Split Air Conditioners From 7,000 Btus To 60,000 Btus, With Check And Eliminate Services Dirt, Damage And Corrosion On The Cabinet, Frame And Coil; Check For Abnormal Noises And Vibrations, Inspect The Engine Heating Level; Check The Piping, Water Drain, Thermostat, Socket, Selector Switch, And Other Electrical Components; Carry Out Leak Tests On Refrigerant Gas Connections And Pipes; Check Operation, Reading And Recording Of Temperatures; Check Compressor Operation, Reading And Registration, Check Cabinet Closing Panel Sealing; Carrying Out All Adjustments And Corrections When Necessary, Including Removing, Washing And Replacing The Device. Including General Cleaning With Descaling Products And General Lubrication., Installation Of Split, Conventional And Invert Air Conditioning Units From 9,000 Btus To 24,000 Btus. With Support Insulating Copper Tubes Electrical Cables And Installation Electrical Equipment, Uninstallation And Installation Of Air Conditioning From 7,000 Btus To 60,000 Btus., Refrigerant Gas R 22, 04/22/2026 - 14:34:58, Refrigerant Gas R 410, 9 And 12 K Inverter Compressor, Compressor Inverter 18 And 24 K, Conventional Compressor 9 And 12 K, Conventional Compressor 18 And 24 K, Condenser Fan Motor 9 To 24 K, Contactor 32 To 220V, Universal Split Electronic Board, Universal Floor Ceiling Electronic Board, Capacitor 35 + 1.5 Mf 450V, Thermal Protector 9000 To 24000 Btus, 60000 Bts 220 V Three-Phase Compressor, 60000 Btus Condenser Fan Motor, R32 Refrigerant Gas.
|