|
Electrical Installation Work Of Heating And Other Electrical Building-Equipment – Schloss Neu-Augustusburg Weißenfels - Implementation Of The Historic Renovation Of The Southern West Wing And South Wing, As Well As The Outdoor Facilities - Lot 498 Prov. Connection Heating. Kg 413 Gas Systems Delivery And Assembly Of Pipelines/Dismantling Services - Gas Pipelines Made Of Seamless Steel Pipes Including Fittings, Connected By Welding Up To Dn 65, 30 M - Installation Of Fittings Up To Dn 65, 2 Pieces, - Dismantling Of Gas Pipes Made Of Seamless Steel Pipes Including Fittings Up To Dn 80, 25M, Kg 420 Heat Supply Systems Supply And Assembly Of Pipes, Components, Dismantling Services - Heating Pipelines Made Of Seamless Steel Pipe Including Fittings, Connected By Welding, Thermal Insulation Without Sheet Metal Casing, Up To Dn 125, 70 M, - Installation Of Fittings Up To Dn 125, 4 Pieces, - Dismantling Of Heating Pipes Made Of Seamless Steel Pipe Including Fittings And Insulation Up To Dn 160, 135 M, - Dismantling Hydraulic Switch 1 Piece, Distributor 3 Pieces, - Dismantling Pump Including Non-Return Valve, Dirt Trap, 4 Pieces, - Dismantling The Exhaust Pipe From The Boiler Up To Dn 200, 15 M, 2 Kg 510 Earthworks - Search Slots, Width 1.00 M, Length 11.3 M, Depth 1.3 M - Hand-Exposing Pipes - Insertion Of Filling Gravel Kg 553 Systems For Gases And Liquids Delivery And Installation Of Pipes - Gas Pipes Made Of Pe 100 Including Fittings, Connected By Heating Weld Sleeves D 90, 25 M Kg 554 Heat Supply Systems Delivery And Assembly Of Pipes, Components, Dismantling Services - Heating Pipes Made Of Seamless Steel Pipe Including Fittings, Connected By Welding, Pre-Insulated Pipe And Fittings, Up To Dn 125, 37 M,
|