Building Construction Work – Development Of Verpeléti School. Total Useful Floor Area Of The Building: 1,857 M2 Net Floor Area Affected By The Interior Renovation: 1,288 M2 Main Quantities: Architecture Facade Frame Scaffolding With A Floor Width Of 0.75 M, Work Floor Height Up To 6.00 M: 1,870 M² Concrete Foundations, Demolition Of Sidewalks Up To 10 Cm Thick, Made Of Gravel Concrete, Slag Concrete: 314.08 M² Concrete Foundations And Patch-Like Etching And Repair Of Concrete Coverings, With Cement Smoothing On A Horizontal Or Inclined Surface 2 Cm Thick: 166.68 M² Partition Wall Demolition: 249.7 M² Plaster Repair On Side Walls: 885 M² Plaster Repair On Ceiling: 826.48 M² Installation Of Suspended False Ceiling With Visible Ribs: 391.2 M² Special Fire Protection (Load-Bearing, Impact-Resistant, Sound-Absorbing) Creation Of Partition Wall: 230.4 M² Creation Of Wall, Pillar, Column And Plinth Covering Indoors: 836.02 M² Creation Of Floor Covering, Indoors: 110.13 M² Leveling Of Newly Made Subfloor Under Flexible Covering, Parquet And Laminate Flooring For Floating Laying: 888.88 M² Hanging Gutter Installation, Semi-Circular Section, In Any Spread Width, Made Of Colored Plastic-Coated Galvanized Steel Sheet: 208 M Installation Of Drain Pipe: 96 M Assembled Cubicle System, With Legs, For The Creation Of Dressing, Toilet And Shower Cubicles: 56.96 M² Installation Of Complete Interior Steel Doors: 57 Pcs. White Or Colored Silicate Wall Painting, On New Or Old Scraped Mineral Prepared Base Surface: 2,650.5 M² Facade Thermal Insulation With Xps Thermal Insulation Boards: 98.6 M² Facade Thermal Insulation With Rockwool Thermal Insulation Boards: 982.54 M² Installation Of Custom-Made Plastic Shutters: 58 Pieces Construction Of Concrete Slabs Or Terrace Covering, From Sidewalks Or Paving Stones: 19.53 M² Construction Of Outdoor Or Sidewalk Paving: 79.4 M² Sports Field Construction Of Cover, With Surface Protective Coating: 166.68 M² Mechanical Engineering: Drinking Water Pipe, Installation Of Cross-Linked Polyethylene Pipe (Pe-Xa): 229 M Installation Of Pvc Drain Pipe, Sheathed Drain Pipe: 97 M Installation Of Pvc-Kgem Drain Pipe, Sheathed Sewer Pipe: 100 M Electric Hot Water Generator Between 20.01 And 80 Liters: 4 Pcs Electric Hot Water Generator Between 80.01 And 200 Liters: 1 Pc Placement Of Different Types Of Small Fans: 7 Pcs Installation Of Thermostatic Valve Head On Radiator Valve: 108 Pcs Installation Of Pp, Pe, Kpe Pressure Pipes: 62 M Electrical: Dismantling Of Wires, Cables And Fittings: 2000 M Grooving, In Brick Wall, 8.01-16.00 Cm² Cross Section Between: 1551 M Placement Of Rigid Smooth-Wall Or Throat Pipe, Plastic Protective Pipe: 2908 M Placement Of Cable Tray, Without Support Structure: 170 M Placement Of Insulated Wire Directly In A Wall Groove Or Laid On The Wall: 1060 M Placement Of Cable-Like Wire On Pre-Made Support Structure: 3638 M Stackable Wall/Standing Distribution System Cabinet Metal: 1 Pc False Ceiling Light Fixture Placement On A Pre-Made Support Structure: 224 Pcs Placement Of Structured Data Transmission Cable With Solid Copper Conductor, 450-600 Mhz Frequency Range: 3200 M Rack Cabinet Installation: 1 Klt The Total Amount Is Included In The Detailed Budget Statement. The Investment Is Not Subject To A Building Permit.
|