|
General Construction Work For Pipelines – Rehabilitation And Expansion Of The Water Supply And Domestic Sewage Systems In The Municipality Of Sfantu Gheorghe, The Establishment Of The Water Supply System In Valcele Commune. Execution Of Works Related To The Contract Cv-Cl-02 Lot 1: Rehabilitation And Expansion Of The Water Supply And Domestic Sewage Systems In The Municipality Of Sfantu Gheorghe, The Establishment Of The Water Supply System In The Commune Of Valcele The Sfantu Gheorghe Water Supply System: · Rehabilitation Of The Raw Water Supply Pipeline From The Source To Stap Sfantu Gheorghe, L= 13004 M; · Rehabilitation Of The Treated Water Supply Pipe, From St Sfantu Gheorghe To Ga Paius, L= 1793 M; · Reservoir Rehabilitation In Ga Sugas. Including Valve Chamber And Related Installations: 1 X 2500 Mc; · Construction Of A Chlorination Station In Ga Sugas And Related Installations; · Expansion/Rehabilitation Of The Ga Sugas Water House, With Flow Meter Chambers, Electric Generator, Drainable Basin, Concrete Platform, New Fencing, Lighting Poles, Etc.; · Rehabilitation Of The Distribution Network In The Municipality Of Sfantu Gheorghe, L= 6557 M; · Rehabilitation Of Buildings, Equipment And Installations At 4 Hydrophore Pumping Stations, Related To The Block Areas. Valcele, Araci And Benedek Mezo Water Supply Subsystems: · Construction Of The Adduction Pipe From The Intersection Of Dn13 E With Strada Fn4, From Valcele Town To Ga Valcele, L= 1,437 M; · Construction Of A New Pumping Station On The Sp1ad Adduction Pipeline: Qp=4.7 L/S, Hp=49 Mca. · Construction Of A Water Household In Ga Valcele, With A 1 X 300 M3 Tank, Flow Meter Chamber, Electric Generator, Drainable Basin, Valve Chamber, Concrete Platform, Fencing, Lighting Poles, Etc.; · Construction Of A New Chlorination Station In The Premises Of The New Ga Valcele, 1 Pc.; · Establishment Of A Distribution Network In The Town Of Valcele, L= 14,278 M; · Extension Of The Distribution Network In The Town Of Araci, L= 4,374 M; · Construction Of A New Pumping Station On The Distribution Network In The Town Of Araci Spap1 Araci Qgrup 1A+1R = 1 L/S + Qinc=5L/S, Hp=10 Mca. · Establishment Of A Distribution Network In The Town Of Benedek Mezo, L= 2,467 M; Sfantu Gheorghe Household Sewage System • Rehabilitation Of The Household Sewage Network, L= 3347 M; • Extension Of The Domestic Sewage Network, L= 2541 M; • Construction Of 2 New Wastewater Pumping Stations With Associated Discharge Pipes: O Wastewater Pumping Station Spau 1 Morii Street: 1+1 Pumps Qtotal = 3.5 L/S, Hp = 16 Mca And Peid Discharge Pipe, 90 Mm, L = 449 M; O Wastewater Pumping Station Spau 2 Strada Fermei: 1+1 Pumps Qtotal = 3.5 L/S, Hp = 17 Mca And Peid Discharge Pipe, 90 Mm, L = 463 M. • Rehabilitation Of Equipment And Installations At 5 Existing Wastewater Pumping Stations: O Wastewater Pumping Station Spau 1 St. Diglui: 1+1 Pump, Q=3 L/S, Hp= 21Mca; O Wastewater Pumping Station Spau 2 Str. Digului: 1+1 Pumps, Q=3 L/S, Hp= 6 Mca; O Wastewater Pumping Station Spau 3 Str. Malomgat: 1+1 Pump, Q=3 L/S, Hp=15 Mca; O Wastewater Pumping Station Spau 4 Str. Malomgat: 1+1 Pump, Q=3L/S, Hp= 15 Mca; O Wastewater Pumping Station Spau 5 Str Orban Balazs: 1+1 Pump, Q=5 L/S, Hp=17 Mca. The Contract Includes: A)
|