|
Construction Administration, Mobilization And Demobilization Of Construction, Construction Sign (For Civil Construction) In Galvanized Sheet *N. 22*, Adhesive, *2.0 Af_03/2024, Rental Of Container 2, 30 10:53:50, 17/04/2026 - 10:53:54, 17/04/2026 - 10:54:01, 17/04/2026 - 10:54:06, 30 (Does Not Include Mobilization/Demobilization), Execution Of Cafeteria On Masonry Construction Site, Rental Of Tubular Metal Scaffolding, Type Of Tower, Each Panel With A Width Of 1 To 1.5 M And A Height Of *1.00* M, Including Diagonal, Connection Bars, Shoes Or Castors And Other Items Required For Assembly (Does Not Include Installation), Assembly And Disassembly Of Tubular Tower Scaffolding (Excluding Scaffolding And Cleaning). Af_03/2024, Electricity Input, Overhead, Single-Phase, With Recessed Box, 25 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_12/2025, Circular Section Reinforced Concrete Post, Extension Of 9, Resistance Of 300 To 400 Dan, Type C-17, Installation/Provisional Sewage Connection - Supply And Installation., Installation/Provisional Water Connection, From The Network To The Hydrometer - Supply And Installation., Siding With Metallic Tile. Af_03/2024, Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placing Formwork). Af_01/2024, Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³/Power: 88 Hp), Width 0.8 To 1.5 M, Depth 1.5 To 3.0 M, With 1St Category Soil (Without Replacement) And Percussion Soil Compactor. Af_08/2023, Landfill Using Soil Cement For Foundations (Trace 1:20) Including Spreading, Homogenization, Wetting And Manual Compaction With 30 Kg Socket In Successive Layers Of 20 Cm Thick, Including Supply Of Material From Deposit., Loading, Maneuvering And Unloading Of Soil And Granular Materials In Dump Truck 10 M³ - Loading With Loader (Bucket From 1.7 To 2.8 M³ / 128 Hp) And Free Unloading (Unit: M3). Af_02/2026, Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_02/2026, Vertical Excavation For Infrastructure, With Loading, Unloading And Transport Of 1St Category Soil, With Hydraulic Excavator (Bucket: 0.8 M³ / 111 Hp), Fleet Of 3 18 M³ Dump Trucks, Dmt Up To 1 Km And Average Speed 14 Km/H. Af_05/2020, Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, Made Of Resin Plywood Sheet, E=17 Mm, 4 Uses. Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Concreting Of Footing, Fck 30 Mpa, Using A Pump - Laying, Thinning And Finishing. Af_01/2024, Surface Waterproofing With Cement Mortar And Sand, With Waterproofing Additive, E = 1.5Cm. Af_09/2023, Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Isol Shoe
|