|
Construction Sign On Canvas Digital Printing Sudecap Standard, Executive Project For Electrical Installations (3 For Adjustment Of Power Transformers And 3 For Correction Of Reactives), Demolition Of Solid Brick Masonry, Manually, Without Reuse. Af_09/2023, Mechanized Demolition Of Concrete, Without Frame, With Pneumatic Equipment, Including Removal And Stacking, Exclusive Transport And Removal Of Demolished Material, Opening Aluminum Door With Paneling, Fixing With Adp Screws Ref 91338, 17/04/2026 - 16:22:06, 04/17/2026 - 16:25:02, Fire Door, Dimension (160X210)Cm, Opening Type, Two (2) Leaves, Including Special Hinge, Closing Spring, Lock, Handle And Other Finishing Hardware, Exclusive Painting, Three-Phase Distribution Transformer, 500Kva/13, 80-11, 40/380-2020, Installation Of 500Kva Transformer, Capacitor Bank For Power Factor Correction, Installation Of Capacitor Bank, Fuses For Protection Of 500Kva Transformer, Fuse Installation Service For Protection Of 500Kva Transformer, Platform - 20Kv Rubber Mat, Rubber Insulating Glove 17Kv Class Ii + Glove Cover, Glove Box With Lid, Copper Cable 8, 7/15Kv Epr 105C 35Mm², Medium Voltage Cabling Exchange, Ext.08 Terminal, 7/15 Kv 025-095 Tpk-01E, Terminal Installation, Industrial Electromechanical Exhaust Fan D= 400Mm + Cabling, Exhaust Installation With Cabling, Conduits, Switches And Other Accessories, Transport With Truck Body With Crane (Munck), Maximum Load Moment 11. 7 Tm, On Urban Road On Natural Bed (Unit: Txkm). Af_02/2026, On Paved Urban Road, Additional For Dmt Exceeding 30 Km (Unit: Txkm). Af_02/2026, Fence Masonry Of Vertically Drilled Ceramic Blocks Of 14X19x39 Cm (Thickness 14 Cm) And Laying Mortar Prepared In A Concrete Mixer. Af_12/2021, Paulista Plaster With Mortar 1:7, Acrylic Painting On Wall, Two (2) Coats, Exclusive Acrylic Sealer And Acrylic Putty/Running (Pva), Acrylic Painting On Ceiling, Enamel Painting On Metallic Structure, Including One (1) Anticorrosive Base Coat, Plastering With Mortar 1:7, Final Cleaning For Delivery From The Work
|