|
Tender for Jhansi Division: Construction Of Rob In Lieu Of Level Crossing No. 437 At Km 1243/7-9 In Between Rru-Bao Stations In Gwl-Dho Section. , - A- Ussor Items , - Dsr Items , - Ns Item , Of Item , Of Item , Of Item , - Wearing Coat With Design Mix Control Concrete M-30/35 Grade With Opc Cement, Coarse Sand And Mechanically Crushed Well Graded Coarse Aggregate 20Mm & Down Size With Use Of Admixture (If Required) Laid To Required Camber & Slope With Temperature Reinforcement As Per Specification And Approved Plan/Design Arrangement Made For Fixing Of Expansion Joints And Drainage Spouts Including Cost Of Cutting, Bending, Binding Including Placing, All Reinforcement Steel Including Cost Of The Binding Wire. Design Mix Concrete With Weigh Batching, Mechanical Mixing, Power Trowelling, Curing Of Concrete For A Specified Period. The Rates Include For All Ascend, Desend, Lead & Lift Above/Below Ground Level, All Labour And Material As A Complete Job. Note: Cement And Reinforcement Steel Will Be Arranged By The Contractor And Payment For The Same Will Be Made Separately Under Relevant Sor/Ns Items. , - Providing & Laying Design Mix Control Concrete Using Weigh Batching Method, M-35/M-40 Using Opc Cement, Coarse Sand Of Approved Quality And Mechanically Crushed Well Graded Coarse Aggregate 20Mm And Down Gauge In Rcc Deck Slab, Centre Verge, End Cantilever, Railing Beam, Anti Crash Railing Etc. To Cast Monolithically To The Required Level As Per Approved Drawing & Design Over Already Launched Main Steel Girder/Psc Girder. The Rates Includes For Working Under Running Traffic Conditions, All Leads, Lifts, Ascents, Descents, All Other Obstructions, Cutting, Hooking, Bending, Maintaining In Position Steel Reinforcement, Cost Of Gi Binding Wire Of Approved Gauge,Designing Concrete Mix, Mechanical Mixing, Vibrating Of Concrete, Use Of Admixtures If Required, Curing Of Concrete For A Specified Period Finishing The Exposed Surface Of Concrete Etc. Complete In All Respect. The Cotractor Should Made Adequate Arrangement Below The Girders To Avoid Falling Of Any Thing Over The Track/Road During Casting Of The Slab. The Rate Also Includes Design And Provision Of All Temporary Arrangement For Casting, Erection, Note: Cement & Reinforcement Steel & Shuttering Will Be Arranged By The Contractor & Payment For The Same Will Be Made Separately Under Relevant Sor/Ns Items.
|