|
1. The Subject Of The Order Are Construction Works Entitled: Renovation Of The Municipal Road Jordanów - Ul. Sosnowa No. 19K At Km From 0+000.00 To 0+180.00 In Jordanów, Miasto Jordanów, Including Construction Works, Including: On: - Demolition Of The Existing Surface With The Sub-Base And The Existing Concrete Sewage; - Profiling Of The Road Body Along With Unblocking The Ditches, Profiling The Bottom And Slopes; - Making A New Sub-Base Of Crushed Aggregate, Bottom Layer 30 Cm, 0/63 Stab. Down.; Top Layer 20 Cm, 0-31.5 Stabl. Moss; - Making A Binding Surface From Mineral-Bitumen Mixtures Of Grit Stones. 5 Cm; - Making A Wearing Course Of Ac11s Mineral-Bituminous Mixtures. 4 Cm; - Construction Of Slopes With A Surface Made Of Crushed Aggregates. 20 Cm; - Construction Of Roadsides With Double Emulsion Fixation And Grit; - Renovation Of Drainage: Renovation Of The Existing Drainage Ditch With Unblocking Of Culverts Under Roads And Exits, Installation Of Prefabricated Sewage On A Concrete Footing, Installation Of Drainage From Perforated Pipes With Drainage With Backfill And Washed Gravel To The Full Depth, Including Inclusion In The Existing Drainage; (...)3. The Remuneration Is To Include The Costs Of Collecting And Testing Samples Indicated In Stwiorb As Well As Those Necessary Resulting From The Order Of The Investors Supervision Inspector, Geodetic Delineation Of The Scope Of Work, Preparation And Organization Of The Construction Site, Preparation And Organization Of Road Traffic, Marking And Securing The Work Area.4. A Detailed Description Of The Subject Of The Order Is Set Out In The Technical Documentation Constituting Annex 9 Of The Swz. 5. The Contractor Will Carry Out The Works At His Own Expense And Risk And Will Provide Surveying Services In Connection With The Works He Performs, As Well As Administrative Services. The Obligations Of The Contractor Of The Order Include In Particular: A. Securing Existing Devices And Networks, B. Preparing As-Built Documentation In Accordance With Applicable Regulations, C. Surveying Services - Marking Out, Support During The Implementation Of Works, Inventory Of The As-Built Part Of The Order Covered By The Design Documentation. D. At Each Request Of The Ordering Party - Presenting A Safety Mark Certificate, A Declaration Of Conformity Or A Certificate Of Compliance With The Polish Standard Or Technical Approval For The Specified Materials, E. Obtaining The Results Of Tests, Examinations And Acceptances Allowing For Use In Accordance With The Intended Use, F. Providing The Construction Site With Utilities Necessary To Perform The Works, G. Preparation And Liquidation Of The Construction Facilities With Water And Energy Supply, Waste Removal, H. Setting Up The Necessary Facilities Required By General Occupational Health And Safety Regulations, P.Poż. Construction Law, Safety Zones, Security, Fences, Signs, Boards, Covers, Etc., I. Construction Insurance6. The Contractor Should Provide A Full Warranty (I.
|