The Project Includes The Reconstruction Of The Municipal Road From Km 0+034 - 0+ 772 With A Total Length Of 732 Meters. The Project Assumes Narrowing The Bituminous Surface To 5.5 M And Constructing A Sidewalk With A Bituminous Surface Along The Entire Road. In Its Current Condition, At Km 0+034 And 0+772 - 1+044, The Road Has A Surface In Good Condition, Not Requiring Road Works. On The Remaining Section, The Project Assumes The Installation Of Two Bituminous Layers And The Incorporation Of Crushed Stone Into The Roadside. Along The Entire Length, On The Left Side, A 2.0 M Wide Left-Side Sidewalk With A Bituminous Surface Is Planned. In Order To Build A New Sidewalk, The Existing Sidewalk At Km 0+730 - 1+044 Must Be Demolished. Bitumen-Surfaced Exits Are Planned Along The Sidewalk And On The Right Side. The Exits Along The Sidewalk Should Be Connected To The Road Surface Using 1:1 Slopes. The Exits On The Right Side Should Be Connected To The Road Surface Using Curves With A Radius Of R = 3.0 M. Within The Existing Exits In The Vicinity Of The Sugar Factory, In Order To Adjust The Height Of The Exit Surface To The Existing Surface, Additional Bituminous Surfaces With A Width Of 1.0 M Are Designed. Currently, On The Left Side Of The Road, There Are Solar-Powered Lighting Poles, Which Interfere With The Designed Sidewalk. The Project Assumes Moving The Poles Beyond The Sidewalk Within The Road Area. Characteristics Of The Designed Road: • Road Category: Municipal, • Traffic Category: Kr1, • Design Speed: 50 Km/H, • Total Length Of The Road - 1,044 M, • Road Surface Works - 738 M • Road Surface Width: 5.50 M • Width Of The Road: 2.75 M• Road Cross-Section: 1X2• Type Of Surface - Mineral And Bituminous Mixture,• Type Of Shoulders: Right-Side Reinforced With Aggregate, 0.75 M Wide• Sidewalk: Left-Side With Bituminous Surface. The Detailed Scope Of Work Is Included In The Design Documentation. Note: The Contractor Will Present All Materials For Approval At Least 7 Days Before Ordering Them. The Ordering Party Requires That The Contractor/Subcontractor Employs, Under An Employment Contract, Persons Performing Work Related To The Performance Of Activities During The Implementation Of The Subject Of The Contract (Excluding Management, Engineering, Surveying And Administrative Staff) Throughout The Entire Period Of Performance Of The Contract. The Type Of Activities Related To The Implementation Of This Order, Performed By Persons Employed Under An Employment Contract, Include In Particular: - Construction Works Related To The (Physical) Performance Of The Order. Detailed Requirements Regarding The Implementation And Enforcement Of The Employment Requirement Under The Employment Contract Are Specified In The Contract Template Constituting An Annex To This Tor.
Contact Information
Address
Gmina Fabianki,Fabianki,87-811,Kujawsko-Pomorskie,Pl619 - Włocławski
Contact No.
542517228
Email
inwestycje@fabianki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111945129
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.