|
1. The Subject Of The Order Is The Preparation Of A Construction And Executive Design For The Task Construction Of A Road For Pedestrians And Bicycles Along The Provincial Road No. 463 On The Ozimek - Krasiejów Section In Accordance With The Conditions Of Swz. 2. The Subject Of The Order Is The Provision Of A Service For The Development Of Design Documentation Along With Obtaining A Zrid Decision For The Construction Of A Pedestrian And Bicycle Road With A Length Of Approx. 1.5 Km Along The Provincial Road No. 463 At Km 20+282÷21+704 On The Ozimek - Krasiejów Section, Along With The Construction/Reconstruction Of Engineering Structures, Reconstruction Of Exits, Construction Of A Service Channel, Construction Of Road Drainage On The Road Section In Question, And Reconstruction Of The Land Infrastructure Network And Devices Colliding With The Investment.2.1. The Subject Of The Order Includes: A) Surveying Works: - Preparation Of A Map For Design Purposes, - Division Of Plots, - Stabilization Of The Boundaries Of The Road; B) Design Works: - Development Of A Construction Design (Including Land Development Design, Architectural And Construction Design And Technical Design) For The Construction Of A Pedestrian And Bicycle Road At Km 20+282÷21+704, Construction, Reconstruction Of Engineering Structures, Reconstruction Of Exits, Construction Of A Technological Canal, Construction Drainage Of The Road, Reconstruction Of The Infrastructure Network And Devices Colliding With The Investment, - Preparation Of An Application For A Decision To Issue A Permit For The Implementation Of A Road Investment Together With The Materials Necessary To Obtain A Decision, - Preparation Of An Executive Design, - Preparation Of A Project Of The Target Traffic Organization Along With Its Approval, - Preparation Of Information Regarding Safety And Health Protection Due To The Specificity Of The Designed Building (Bioz), - Preparation Of Detailed Technical Specifications For The Execution And Acceptance Of Construction Works, - Preparation Of The Cost Estimate Part (Investors Cost Estimate, Offer Cost Estimate, Bill Of Quantities, Calculation Of Unit Prices), - Preparation Of Studies In The Field Of Environmental Protection, Including An Eia Report If Required Together With Obtaining A Decision On The Environmental Conditions Of The Project, - Development Of Concepts For Design Solutions In Min. Two Variants, - Preparation Of A Water Law Report And Obtaining The Required Water Law Permits Separately. The Contractor, Hereinafter Also Referred To As The Design Unit, Should Obtain The Water Permits Required By Law, Referred To In Art. 388 Of The Water Law Act, Including: Water Law Permits To The Required Extent (Including Water Services, Special Use Of Water, Construction Of Water Facilities, Including Temporary Bridge Structures/Culverts, If Required), - Obtaining A Water Law Assessment - If Required, Fees Related To Obtaining Water Law Permits And All Necessary Annexes To Obtai
|