|
1. The Subject Of The Order Is: Current Maintenance And Maintenance Of Existing Gravel Surfaces Of Municipal Streets In The City Of Gniezno.2. The Scope Of The Subject Matter Of The Order Includes In Particular The Following: A) Spot Renovation Of The Crushed Stone Surface With Sprinkling With A Cationic, Fast-Disintegrating Modified Emulsion, With An Asphalt Content Of Min. 65% Over 2 Cm In Depth, In The Amount Of - 1900 M2 - Banking Or Cutting Out The Damaged Area With Irregular Shapes, - Removing Loose Material, Cleaning The Pothole From Dirt And Dusty Parts, - Filling The Defect With Hard Crushed Stone With A Grain Size Of 0-63 Mm, Rolling With A Roller, Wedging, Rolling Again, - Sprinkling The Renovated Surface With Emulsion Cationic, Quick-Disintegrating, Modified With Grinding With 0-5 Mm Grit, B) Renovation Of A 10 Cm Thick Gravel Surface Without Sprinkling, In The Amount Of - 1000 M2 - Fencing Or Cutting Out The Damaged Area In Irregular Shapes And Making Vertical Edges, - Removing Loose Material, Cleaning The Pothole From Dirt And Dusty Parts, - Filling The Defect With Hard Crushed Stone With Grain Size 0-63 Mm, Rolling, Wedging With Water Pouring, - Repeated Rolling With Grinding, C) Mechanical Laying Of A 10 Cm Thick Layer Of Crushed Concrete Or Of Similar Hardness, Sorted With A Grain Size Of 0-63 Mm, In The Amount Of - 700 M2 - Mechanical Shaping Of The Subsoil With A Grader, - Laying Of Ballast And Rolling With Wedging With Fine Grit - Thickness. 10 Cm Layer After Rolling, D) Laying A Layer Of Bituminous Reclaimed Material With A Thickness Of 10 Cm And Caving - 400 M2, E) Renovation Of The Crushed Stone Surface With High-Density Defects Intended For Re-Profiling, In The Amount Of - 2100 M2 - Mechanical Breaking And Loosening Of The Damaged Surface With A Grader Ripper, - Re-Profiling Of The Excavated Material (Loose Material) And Making An Even Surface With Longitudinal And Transverse Slopes, - Embankment Of The Renovated Surface Surface, F) Renovation Of The Crushed Stone Surface With Sprinkling Of A Cationic, Quick-Disintegrating Modified Emulsion With An Asphalt Content Of Min. 65% Up To 2 Cm Deep, In The Amount Of - 1000 M2. The Quantities Are Estimated And May Change During The Course Of The Work. For The Performance Of Works That Are Not Included In The Above List, Please Provide In Annex No. 2 In The Price Form The Unit Prices Included In The Calculation Of The Estimated Value: I.E. The Man-Hour Rate, Overhead Costs, Purchase Costs, Profit And The Price For The Removal Of Demolition Materials.
|