|
A. The Subject Of The Order Is The Implementation Of The Second Stage Of Development Of The Square On Plots No. 2684/2, 2684/4, 2687/1, 2685, 2681/1 And 2686/13, Kłodnica District In Kędzierzyn-Koźle At Ul. Portowa And Karol Szymanowski, Based On Design Documentation Prepared By Brzeskie Przedsiębiorstwo Zieleni Piotr Siwik Ul. Jana Pawła Ii 17/4, 49-300 Brzeg. B. The Scope Of Works Carried Out As Part Of The Currently Implemented Stage Ii Includes, Among Others: 1) Cutting Down Trees And Shrubs That Are In Poor Health Condition Or Interfere With The Investment, 2) Hardening The Surface With Concrete Cubes, 3) Constructing An Asphalt Surface, 4) Constructing Alleys With A Mineral Surface, 5) Constructing Paths From Concrete Slabs Embedded In Lawns, 6) Installing Metal Pergolas, 7) Installing Other Small Architecture Objects, 8) Implementing Planting Trees And Shrubs,9) Creating Flower Meadows,10) Installing Lawn Surfaces,11) Installing Square Lighting,12) 3-Year Greenery Care.C. The Scope Completed In The First Stage Is Marked In Yellow In The Drawing Attached To The Swz. As Part Of The First Stage, The Following Were Implemented: 1) Part Of The Pedestrian Routes With A Facing Layer Of Stone Flour, 2) 5 Parking Spaces With A Concrete Block Surface, 3) Asphalt Surface Between The Road And The New Parking Lot Made Of Concrete Cubes, 4) Purchase And Installation Of Two Park Benches. D. The Execution Of The Order Also Includes: 1) Preparation Of As-Built Documentation - 2 Sets. In Electronic Version + 2 Sets In Paper Version.2) Comprehensive Surveying Service With Post-Construction Surveying Inventory In 4 Sets. (Including 2 Sets On An Electronic Medium) And Changes In The Records, Including The Division And Allocation Of Land For Facilities. Format And Content Of Files Containing As-Built Measurements In Vector Form. The File Format Is .Dwg Or .Dxf. Information About The Coordinate System Used Is To Be Attached To The Files. Currently Used In The Commune: 1965 Zone Iv. The Outlines Of Objects Included On The Maps Should Be Divided Into Layers By Industry And Described In Accordance With The Technical Instruction K-1 Regarding Basic Maps. Due To The Specificity Of Street Lighting Facilities - If Any - Should Be Described With The Following Layers: Low Voltage Connection Cables. - Polyline1), / Cables Of Lighting Circuits - Polyline1), Protective Pipes - Section, Joints - Point, Street Lamps - Point 2), Street Lighting Cabinets - Rectangle 2) Where 1) - Description Of A Cable With A Constant Cross-Section (Without Breaks On Piped Sections), 2) - Object Additionally Described With The Number Specified In The Design Documentation; 3) Providing The Ordering Party With Geodetic Documentation Containing The Results Of The Geodetic Inventory As-Built, Including The Map Referred To In Article 2 Point 7B Of The Act Of May 17, 1989 – Geodetic And Cartographic Law, I.E. The Results Of As-Built Measurements, Including A Map Bearing, Taking Into Account Article 1
|