Part I Of The Order: Performance Of Construction And Installation Works Related To The Renovation Of A Vacant Building At Ul. Racławicka 2/4. The Detailed Scope Of Works For Part I Of The Order Includes, Among Others: 1) Performance Of Dismantling And Demolition Works; 2) Performance Of General Construction Works; 3) Performance Of Works Related To The Installation Of Construction Joinery And Carpentry Works; 4) Performance Of Works Related To Water, Sewage And Sanitary Installations; 5) Performance Of Works Related To The Installation Electricity;6) Carrying Out Works Related To Central Heating;7) Renovation Works;8) Preparing The Basement For Use;9) Waste Removal And Disposal. Note:• When Pricing The Offer, The Contractor Should Be Guided By The Scope Specified In The Bill Of Quantities (The Bill Of Quantities Should Be Used As An Aid In Calculating The Price).• The Price Should Include The Purchase And Installation Of Carbon Monoxide Sensors For Each Residential Premises.The Scope And Description Of The Subject Of The Order Is Determined By:1) Bill Of Quantities Works;2) Stwiorb;3) Premises;4) Design Documentation Prepared By: Leszek Kwiecień Biuro Projektów Euro-Instal, Ul. Osiedle Kolorowe 15/35, 31-939 Kraków (Applies To Part I) - Published On The Website Of The Ongoing Procedure. Performance Of The Subject Of The Order Also Includes: 1) Making The Necessary Arrangements Related To The Implementation Of The Task (E.G. With The Road Manager, Property Owners) And Incurring Related Costs, If Necessary; 2) Organization, Development And Marking Of The Construction Site And Liquidation Of The Construction Site; 3) The Contractor Is Obliged To Organize And Carry Out Construction Works In A Manner Safe, Not Posing A Threat To People Staying In The Investment Area. In Particular, He Is Responsible For Carrying Out Construction Works In Accordance With The Requirements Of The Regulation Of The Minister Of Infrastructure Of February 6, 2003 On Health And Safety During Construction Works (Journal Of Laws Of 2003, No. 47, Item 401);4) In The Event Of Damage To Existing Utilities And Other Existing Elements, Compensation For Losses Will Be Enforced Based On As-Built Calculations And Losses Resulting From The Lack Of Power Or Transmission Prepared By The Injured User Or The Owner;5) Maintaining Order During The Implementation Of The Works, Systematically Tidying Up The Work Sites And Tidying Up After The Completion Of The Works;6) The Contractor Should Perform All Activities Necessary For The Implementation Of The Works In Such A Way That, Within The Limits Resulting From The Need To Fulfill Contractual Obligations, It Does Not Disturb Public Order, Access, Use Or Occupation Of Public And Private Roads, Sidewalks And Squares To And On Areas Belonging To Both The Ordering Party And Third Parties More Than Necessary;7) The Contractor Should Protect The Ordering Party Against Any Claims, Proceedings, Damages And Costs That May Result From Failure To Comply W
Contact Information
Address
Miejski Zarząd Budynków Komunalnych W Kędzierzynie-Koźlu,Kędzierzyn-Koźle,47-220,Opolskie,Pl524 - Opolski
Email
przetargi@mzbk.kedzierzynkozle.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111943247
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.