|
1. The Subject Of Part No. 1 Of The Order Is Performing Investor Supervision Over The Implementation Of The Investment Task Entitled Reconstruction Of The Existing Building For The Needs Of The Kraśnik Academy Of Development.2. The Order Is Implemented As Part Of The Polish-Swiss Urban Development Program Co-Financed By The Second Edition Of Swiss Financial Assistance For Selected European Union Member States In Order To Reduce Socio-Economic Differences Within The European Union.3. Investor Supervision Will Be Performed Comprehensively In The Following Industries: Construction, Electrical And Sanitary. 4. The Investment Task Covered By Investor Supervision Will Be Implemented Based On The Design Documentation, Explanations And Its Changes Introduced By Explanations And Changes To The Content Of The Swz, Which Are Available On The Website Available At The Link Https://Ezamowienia.Gov.Pl/Mp-Client/Search/List/Ocds-148610-17Cd74c7-548D-43E2-9878-91001Fad1b68.5. The Aim Of The Investment Task, The Implementation Of Which Will Be Subject To Supervision, Is The Adaptation Of A Building Located In Kraśnik At Ul. Sikorskiego 22, For The Needs Of The Kraśnik Academy Of Development And The Kraśnik Center For Entrepreneurship And Innovation. The Scope Of Works Covered By The Supervision Includes In Particular: 1) Demolition And Dismantling Works, Including The Demolition Of The Existing Transformer Station Building With A Basement, 2) Extension Of The Building With An Elevator, 3) Construction Of Flights Of Stairs In Staircases With Balustrades, 4) Construction Of The Ceiling Between Part Of The Ground Floor And First Floor Of The Building, In The Middle Staircase, 5) Construction Of New Partition Walls, 6) Bricking Up Some Of The Openings Windows, 7) Addition Of Gravity Chimneys On The First Floor, 8) Reconstruction And Construction Of New Door Openings, 9) Installation Of Plasterboard Installations (Including Countertops On Horizontal Sections In The Rooms), 10) Installation Of Suspended Ceilings, 11) Installation Of New Door Joinery, Replacement Of Window Joinery, 12) Construction Of New Floors In Some Basement Rooms, 13) Change Of The Arrangement Of Hydrants Fire Protection, 14) Construction Of New Sanitary, Electrical And Telecommunications Installations, Including Mechanical Ventilation, 15) Drying And Insulation Of Foundations And Basement Walls (Including The Injection Method), 16) Repairing And Supplementing Plasters In Basement Rooms, Painting And Wall Cladding Works, 17) Execution Of Roof Layers With Covering, Taking Into Account Appropriate Thermal Insulation And Fire Protection Parameters, 18) Execution Thermal Insulation Of The Building Walls, 19) Installation Of Coated Sheet Metal Flashings And Gutters, 20) Installation Of Glass Roofs Over The Entrances To The Building, 21) Construction Of External Reinforced Concrete Stairs Leading To The Heat Exchanger At The Basement Level, 22) Installation Of Smoke Exhaust Flaps In Staircases, 23) Demoli
|