Quotation are invited for Chroming / Polishing / Refurbishment of High-Pressure Isolation Valves Stems at L-2 Station. TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORKL 2 STATION , JABEL ALI POWER STATION#DHGT251659264FLAYOUTINCELL1FALLO WOVERLA P1FBEHINDDOCUMENT1FHIDDEN0FLAYOUTINCELL 1TITLE : REFURBISHMENT/CHROMING/ POLISHING OF HIGH-PRESSURE ISOLATION VALVE#S STEM, QTY- 15 N OBRIEF SCOPE OF WORK:REFURBISHMENT, POLISHING & CHROMING OF HIGH-PRESSURE ISOLATION VALVESSTEMS, QTY-15 NO SIZE -2# MATERIAL F316 I STELLITED, STEM 17CR QTY-11SIZE -4# MATERIAL SSW 1.4122 QTY- 1SIZE -6# MATERIAL F316 I STELLITED, STEM 17CR QTY- 1 SIZE -8# MATERIAL F316 I STELLITED, STEM 17CR QTY- 2SIZE -10# MATERIAL F410 SS QTY- 1DURATION OF WORK-15 DAYS AFTER COLLECTION OF STEMS FROM DEWADE TAILED SCOPE OF WORK:Ø#AFTER GETTING THE RFX, SITE VISIT TO DEWA TO CHECK THE STEMCONDITIONS AND MEASUREMENTØ#CLEARLY UNDERSTAND THE SCOPE OF WORK WITH DEWA ENGINEER IN CHARGE TOAVOID ANY CONFUSION DURING THE WORK.Ø#AFTER PO, COLLECT &TRANSPORT THE STEM FROM DEWA L 2 STATION TOCONTRACTOR#S WORKSHOPØ#CLEANING OF THE STEM.Ø#TRUENESS CHECKING OF THE STEM. IF TRUENESS IS OK, PROCEED THE BELOWØ#SUB MISSION OF VISUAL INSPECTION REPORT, DIMENSIONS OF THE STEMS ANDMETHOD OF STATEMENT OF REPAIR.Ø#CARRY OUT STANDARD REPAIR FOR THE DA MAGED AREAS OF STEM AS PERAPPROVED METHOD OF STATEMENT.Ø#MACHINING OF THE STEM AFTER REPAIRING UP TO THE EXACT DIMENSIONS ASMEASURED EARLIER.Ø#CHROMING AND POLISHING OF STEM.Ø#PROPER LAPPING OF THE STEM BACK SEAT .Ø#CLEANING AND MACHINING OF THE STEM THREADS.Ø#REQ UIRED NDE FOR THE REPAIRED STEM . ( DT, PRE HEAT, POST WELD HEATTREATMENT ETC. ( IF REQUIRED) .Ø#FINAL DIMENSIONS MEASUREMENT.Ø#ALL THE NDE REPORTS SHALL BE WILL BE SUBMITTED TO DEWA WITH DELIVERY.Ø#ELECTRODE CERTIFICATE WHICH WAS USED FOR WELDING TO BE SUBMITTED TODEWA WITH DELIVERY.Ø#PACKING THE STEM AND DELIVER AT DEWA L 2 STATION.Ø#SUBMITTING FULL REPAIRING REPORT WITH THE STEP BY STEP REP AIR PHOTOSTO DEWA REPRESENTATIVE.WARRANTY FOR ONE YEAR# Qty: 11 Chroming / Polishing / Refurbishment of High-Pressure Isolation Valve#S Stems at L-2 Station STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600862)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111941777
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.