|
Construction Work – New Technologies District – Katowice Gaming And Technology Hub – Stage Ii. 1. The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Production Hall Facility, Which Is A Multifunctional Technological Space Facility Along With The Development Of Adjacent Areas - Stage Ii As Part Of The Investment Task Titled New Technologies District - Katowice Gaming And Technology Hub. 2. The Scope Of The Investment Includes In Particular: A) Construction Of A Facility With Production Halls For The Needs Of The Gaming Industry, Which Is A Multifunctional Technological Space Facility, B) Implementation Of The Communication System And Parking Spaces, C) Implementation Of Land Development. Characteristic Parameters Of The Facility: - Building Area: Approx. 9,615 M², - Usable Area: Approx. 27,888 M², - Volume: 236,107 M3, - Number Of Above-Ground Floors: 4, - Number Of Underground Floors: 1. The Subject Of The Contract Is The Performance Of Construction Works, Including: - Preparatory Works, - Works Earthworks, - Structures, - Floors, Walls, Plasters, Ceilings, - Finishing Works, - Joinery And Joinery, - Roof, - Facades, - Connections, - Internal Water And Sewage Installations, - Central Heating Installations, - Ventilation And Air Conditioning Installations, - Electrical Installations And Photovoltaic Devices, - Structured Cabling Installations, - Video Monitoring Installations, - Pms Supervision System (Energy Equipment Supervision System), - System Bms, - Safety Installations: Lightning Protection, Anti-Shock Protection, Anti-Overvoltage Protection, Grounding, Equipotential Bonding, - Telecommunications Installations, - Electroacoustic Installations, - Studio/Stage Lighting Installations, - Studio/Stage Mechanics Control Installations, - Television/Recording Installations, - Technological Channel, - Paving, - Road Infrastructure, - Tree Felling, - Greenery, Replacement Plantings, - Small Architecture, - Renewable Energy Sources Renewable Energy Sources, Among Others In The Form Of A Ground Heat Exchanger. 3. The Detailed Scope Of The Subject Of The Order Is Specified In: - Design Documentation - Annex No. 9 To The Swz, - Technical Specifications For The Execution And Acceptance Of Construction Works - Annex No. 10 To The Swz, - Bills Of Quantities - Annex No. 11 To The Swz, - Designed Contractual Provisions - Annex No. 8 To The Swz, - Conditions For Carrying Out The Works - Annex No. 12 To The Swz. 4. Quality Guarantee Period And Warranty For Defects - The Ordering Party Requires That The Quality Guarantee Period For The Completed Subject Of The Contract Is 60 Months From The Date Of Final Acceptance. Moreover, The Ordering Party Requires That The Warranty Period For Defects Be Equal To The Quality Warranty Period. The Terms Of The Guarantee And Warranty Are Specified In Annex No. 8 To The Swz - Draft Provisions Of The Contract.
|