Construction Work – New Construction Of A Rescue Station With A Disaster Base In Bad Belzig - Lot 1 Extended Shell Construction. Construction Site Equipment: Construction Fence, Meeting Container, Sanitary Container; Construction Sign, 500M² Construction Road, 40M² Crane Location, Cover Of Steel Plates, 90 D Construction Heating, Construction Water Connection, Construction Site Power Distribution And Construction Lighting, Construction Survey, Demolition Construction Site Clearance: Disease Pan, 45M³ Building, 1T Disposal Of Roofing Fiber Cement With Asbestos, 200M² Concrete Slab, 75T Transport And Disposal Of Concrete (Up To Z2 Or Rc-3), Clearing 1,033.86M² Of Construction Area And Turf, 180M² Of Road Demolition, 180M² Of Surface And Road Restoration Earthworks, 360M³ Of Excavation Of Pipe Trenches Rw, 700M² Of Standardized Shoring Rw T Up To 3M, 180M Of Open Dewatering Rw, 323M Of Pp Pipes Including Fittings, 11 New Shaft Construction Rw, 43M Line Trench For Road Drain/Drainage Pipes And Pp Od 160, 80M Trench For Gravel Trenches And Create Trough, Supply 150M³ Gravel And Topsoil, 470M³ Excavation Pipe Trench T To 3M Sw, 24M Excavation Construction Pit For Shaft Dn 1000, 470M³ Excavation Removal Sw, 280M³ Soil Install Sw, 180M³ Floor Rlz Deliver Sw, 930 M² Shoring Sw T Up To 3M, 250M Pp Pipes Incl. Fittings For Sw, 11 Pieces Sw Shaft Sw, 250M³ Excavation Pipe Trench Tw, 700M² Shoring Tw, Lay 200M Pe Pressure Pipe 50X4.6Mm Tw, 2,420M² Topsoil Remove For Construction Pit, Loosen 1,910M³ Of Soil For Construction Pit, Fill 320M³ Construction Pit With Gravel, - 1 Piece Rain Retention/Infiltration Basin - 1 Piece Abkw Separator System A Neutracom Ns 10-2500 Sedimentation Device. - 1,190 M² In-Situ Concrete Clean Layer - 1,680 M² In-Situ Concrete Floor Slab Reinforced Concrete - 234 M³ In-Situ Concrete Strip Foundations - 610 M² In-Situ Concrete Ceiling Slab Reinforced Concrete - 410 M² Ceiling Hollow Slab Prefabricated Prestressed Concrete Slab H 20Cm, W 1200Mm - 14 Pieces Of Prefabricated Shed Roof Truss H/W=90/30Cm, Individual Length 13.36M And 11.36M - 37 M³ In-Situ Concrete Reinforced Concrete Lintel Beams - 185 M³ In-Situ Concrete Reinforced Concrete Outer Wall - 215 M³ In-Situ Concrete Reinforced Concrete Inner Wall - 12 Pcs In-Situ Concrete Reinforced Concrete Supports Sb2 Rectangular, L 300-350Cm - 4 Pcs. Stair Flights Straight Prefabricated Panels D 20Cm, Run B, Slopes 9 And 11 - 112 T Of Reinforcing Steel Bars - 480 M² Masonry External And Internal Walls Ks L-R P Sfk12 Rdk1.4, D 24Cm - 105 M² Masonry Non-Load-Bearing Internal Walls Ks L-R Sfk12 Rdk1.4, D 17.5Cm - 170 M² Vertical Insulation And Sealing Work Outside - 500 M² Horizontal Sealing On The Floor Slab Inside - 690 M² Internal Plaster 2 Layers Internal Wall Up Lime Cement Normal Plaster Mortar D10mm - 320 M² Cement Heating Screed 4Kn /M² Ct-C25-F5-S75-H45 - 35 M² Cement Screed Screed On An Insulating Layer Over 5Kn / M² C40 F4 D 80Mm - 110 M² Cement Screed Screed 6Kn/M² Proven - 385 M² Cement Screed Screed 4Kn/M² C25 F5
|