|
Plastering Work – Sep Gs Schützenstraße - Renovation And Expansion - Interior Plastering Work. New Plaster In The Interior Of The Newly Built Extension Building And 3 Existing Buildings After Demolition Of The Existing Plaster On Site 1 Existing Building 1.1 Additional Construction Site Equipment Standing Scaffolding For Plastering Work In The Stairwell; Mobile Work Platform; 1.2 Preparatory Work Protective Cover For Doors And Windows, Approx. 350 M²; Remove Plaster And Mortar Residues From The Substrate, Approx. 150 M²; Demolish Unsustainable Existing Plaster (Individually Or In Strips), Approx. 10 M²; 1.3 Substrate Pretreatment Primer/Burn-On Barrier For Gypsum Plaster, Approx. 2250 M² (Walls And Soffits); Primer/Plaster Bonding Bridge For Gypsum Plaster, Approx. 85 M² (Walls, Soffits, Ceiling); Spray Plastering For Lime Cement Plaster, Approx. 517 M² (Walls And Soffits); Approx. 120M² Plaster Reinforcement With Fiberglass Fabric, 830M Outside Corners With Edge Profile, Approx. 440M Plaster Connection With Plaster Strip, Approx. 213M Plaster Connection With Separating Strips, Small Quantities Of End And Expansion Joint Profiles; 1.4 Gypsum Plaster New Gypsum Plaster Q3 Indoors; Approx. 1971 M² Walls, Approx. 615 M Reveal In Different. Widths, Approx. 30 M² Ceiling/Staircase Soffits; 1.5 Lime Cement Plaster New Lime Cement Plaster Q2 Indoors, In Sanitary Rooms; Approx. 425 M² (Walls And Soffits); Approx. 395 M² Plastering Q3 On New Lime Cement Surfaces; Add/Work On/Repair The Existing Lime Cement Plaster In The Existing Building (Individually And In Strips) Approx. 87M²; 2 Extension/New Building 2.1 Additional Construction Site Equipment Standing Scaffolding For Plastering Work In Stairwells; Mobile Work Platform; 2.2 Preparatory Work Protective Cover For Doors And Windows, Approx. 414 M²; Remove Concrete/Mortar Ridges In The Subsurface, Approx. 520 M²; Close Approx. 200M Of Wall Slots; Insulate Approx. 133M Of Window Parapets; Occasionally Measure Concrete Moisture And Remove Release Agents; 2.3 Substrate Pretreatment Primer/Plaster Bonding Bridge For Gypsum Plaster, Approx. 2390 M² (Walls, Supports And Soffits), Approx. 44 M² Of Ceilings, Approx. 50 M² Of Stair Soffits; Spray Plastering For Lime Cement Plaster, Approx. 400 M² (Walls And Soffits); Approx. 55 M² Plaster Reinforcement With Fiberglass Mesh, Approx. 70 M² Plaster Reinforcement With Metal Mesh (Strip-Shaped), 624 M Outside Corners With Edge Profile, Approx. 452 M Plaster Connection With Plaster Strip, Approx. 705 M Plaster Finish With End Profile, Small Quantities Of Expansion Joint Profiles; 2.4 Gypsum Plaster New Gypsum Plaster Q3 Indoors; Approx. 2291 M² Walls, Approx. 420 M Reveal In Different. Widths, Approx. 12 M Supports/Templates, Approx. 44 M² Ceiling, Approx. 50 M² Stair Soffits; 2.5 Lime Cement Plaster New Lime Cement Plaster Q2 Indoors, In Sanitary Rooms; Walls Approx. 390 M², Approx. 44 M Reveal; Plaster Smoothing Q3 On New Plastered Surfaces, Approx. 142 M² Walls And 30 M Reveal; 3 Hourly Wage Work, Hourly Rate Fa, Hourly Rate For Skilled Workers/Workers
|