List Of Works Carried Out During Fire Extinguisher Maintenance • Equipment Assessment. Dismantling A Fire Extinguisher. • Depressurization. Inspection Of The Locking And Starting Device (Zpu). Elimination Of Deformation Of The Gearbox Mechanism. Replacing The Valve Insert. • Blowing Out The Siphon Tube. • Replacement Of The Mass Of Fire Extinguishing Filler “Foskon - 430”. • Connection Of The Zpu With The Siphon Tube And With The Neck Of The Fire Extinguisher Body. • Injection To Operating Pressure Рrab – 1.7 Mpa (17 Kgf/Cm2). Checking The Thread Connection: Seal In The Neck, Control Pressure Gauge In The Seal For Leaks. • Sanitary Treatment Of The Fire Extinguisher Body, Working Hose With Barrel. • Hermetic Connection Of The Working Hose Fitting With The Barrel, With The Sealing Device, Thread Sealing With A Specialized Sealing Tape. • Certification And Sealing Of The Fire Extinguisher. • Transport Of Fire Extinguishers To Refueling Stations By The Supplier Quantity: Op4-4 Pieces, Op5-6 Pieces
Contact Information
Contact Person
Калиева Меруерт Ерлановна
Address
634030100, 070500, Казахстан, г. ГЛУБОКОЕ, ул. Поповича, д. 19А, оф.
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 111918895
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.